My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Bendix Theater eSports Arena Proj No. 119-106D - Nelco Media, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Bids
>
Opening of Bids - Bendix Theater eSports Arena Proj No. 119-106D - Nelco Media, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 2:01:51 PM
Creation date
2/9/2021 2:00:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend, IN – Project No. 119-106CR <br />3 <br /> <br />Proprietary and Confidential – Nelco Media, Inc. <br />skills of industry veterans with skills in video, audio, broadcast and IT. <br />Project Phases <br /> Activation – As soon as Nelco Media receives your order, it will designate necessary staff <br />to deliver the quoted studio update and will execute the project. <br /> Pre-Design Phase – This phase includes a consultation conference call to establish <br />service requirement details. Initial plan timeline will be adjusted accordingly. <br /> Design and Engineering – Nelco Media will develop a draft one-line diagram of product <br />component connections and configurations and provide it to the client team. <br /> Document Refinement and Approval Phase – Nelco Media will revise and submit for <br />approval a One-Line diagram. Nelco Media will provide one re-design of the diagram and <br />the configuration. <br /> Delivery / Staging – Nelco Media will order quoted hardware product(s) which will be <br />shipped to the Nelco Media offices in San Antonio for testing and staging. Larger items <br />will be shipped directly to Client. <br /> Studio Build-out – After all equipment has been delivered to Nelco Media and has <br />passed necessary testing, it will be delivered to Client arena, installed and configured. <br /> Close-Out –Documentation will be revised to detail any agreed-upon changes to project <br />scope or functionality and provide configuration notes. Once notes are delivered, the <br />project will be closed. Any change orders after Approval Phase will be billed to the Client <br />at additional charges. <br />Assumptions <br />The following assumptions have been made in relation to the services to be delivered in <br />conjunction with this Project Proposal: <br />• Client will handle all electrical contracting for project. <br />Client Responsibilities <br />As a requirement for the performance of Services detailed herein and the provision of all <br />Deliverables, the Client is required to complete the following: <br />• Client will bear responsibility for all structural and safety code compliance of <br />existing facilities. <br />• Client will supply electrical power for all aspect of the facility upgrade. <br />• Client will be responsible for any modifications to the existing HVAC system that <br />may be required. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.