Laserfiche WebLink
SMIC 639 <br />Indiana Department Of Transportation <br />Report of Contract Final Inspection and <br />Recommendation for Acceptance <br />Contract R -39540 <br />Date Construction Substantially Completed: 09/11/2020 <br />(The contract is sufficiently completed so that it can be used for its intended purpose.) <br />All Contract Work Complete Date 10/28/2020 <br />(The date all items were complete, except punch list and removal of traffic control devices.) <br />Pre-Final Inspection made by Leslie Biek, Toy Villa, Patrick Patterson, Joe Dunbar, Scott <br />Crites, Jamie Plunkett, Dave Barbour, Todd Leinbach & Dale Wills <br />Date Punch List Items Completed: 11/06/2020 <br />Sod Maintenance Expired on : 11/25/2020 <br />on 10/28/2020 <br />Date Failed Material Replaced: N/A <br />Final Inspection made by: Leslie Biek, Toy Villa, Dave Barbour & Dale Wills <br />and all work was found to be satisfactory from Station <br />on 12/02/2020 <br />45+00 To 54+00 <br /> Construction Signs and Temporary Traffic Control Devices Removed: 12/04/2020 <br />Pavement Markings (have) (have not) been placed in accordance with the IMUTCD manual or as <br />directed by the District Traffic Engineer. <br />Right-of-Way (is) (is not) clear of all encroachments. <br />Date of Last Work: 12/04/2020 <br />RECOMMEND ACCEPTANCE <br />DISTRICT CONSTRUCTION ENGINEER <br />LOCAL PUBLIC AGENCY <br />* By: <br />*County or City signatures <br />when required (at least two). <br />*By: <br />*By: