BID TABULATION
<br />Ductile Iron Pipes, Valves, and Hydrants
<br />Project No: 120-054
<br />For Bids Due: November 24, 2020
<br />Item No.Description Quantity Unit Unit Price Total Unit Price Total Unit Price Total
<br />BASE BID
<br />1 4" X 18' Ductile Iron Pipe 10 EA 347.22$ 3,472.20$ 347.94$ 3,479.40$ $360.33 3,603.28$
<br />2 6" X 18' Ductile Iron Pipe 10 EA 270.36$ 2,703.60$ 266.04$ 2,660.40$ $275.61 2,756.09$
<br />3 8" X 18' Ductile Iron Pipe 10 EA 356.22$ 3,562.20$ 357.84$ 3,578.40$ $370.69 3,706.90$
<br />4 10" X 18' Ductile Iron Pipe 5 EA 460.80$ 2,304.00$ 463.14$ 2,315.70$ $479.77 2,398.85$
<br />5 12" X 18' Ductile Iron Pipe 5 EA 587.16$ 2,935.80$ 590.04$ 2,950.20$ $611.39 3,056.97$
<br />6 16" X 18' Ductile Iron Pipe 5 EA 864.18$ 4,320.90$ 868.68$ 4,343.40$ $900.09 4,500.46$
<br />7 20" X 18' Ductile Iron Pipe 5 EA 1,138.68$ 5,693.40$ 1,143.36$ 5,716.80$ $1,184.43 5,922.14$
<br />8 24" X 18' Ductile Iron Pipe 5 EA 1,438.92$ 7,194.60$ 1,446.48$ 7,232.40$ $1,498.58 7,492.89$
<br />9 30" X 18' Ductile Iron Pipe 5 EA 1,978.92$ 9,894.60$ 1,987.74$ 9,938.70$ $2,059.43 10,297.15$
<br />10 4" Open Right, MJ valve 10 EA 392.00$ 3,920.00$ 428.20$ 4,282.00$ $338.72 3,387.20$
<br />11 6" Open Right, MJ valve 50 EA 500.00$ 25,000.00$ 544.87$ 27,243.50$ $432.04 21,602.00$
<br />12 8" Open Right, MJ valve 10 EA 778.00$ 7,780.00$ 853.72$ 8,537.20$ $688.09 6,880.90$
<br />13 10" Open Right, MJ valve 5 EA 1,205.00$ 6,025.00$ 1,281.32$ 6,406.60$ $1,072.86 5,364.30$
<br />14 12" Open Right, MJ valve 5 EA 1,534.00$ 7,670.00$ 1,679.73$ 8,398.65$ $1,357.56 6,787.80$
<br />15 5.25" SB Fire Hydrant, 5 FT 20 EA 1,619.00$ 32,380.00$ 1,705.80$ 34,116.00$ $1,559.00 31,180.00$
<br />16 5.25" SB Fire Hydrant, 5.5 FT 40 EA 1,659.00$ 66,360.00$ 1,743.13$ 69,725.20$ $1,592.00 63,680.00$
<br />17 5.25" SB Fire Hydrant, 6 FT 40 EA 1,684.00$ 67,360.00$ 1,780.46$ 71,218.40$ $1,625.00 65,000.00$
<br />18 5.25" SB Fire Hydrant, 6.5 FT 20 EA 1,691.00$ 33,820.00$ 1,680.19$ 33,603.80$ $1,658.00 33,160.00$
<br />19 5.25" SB Fire Hydrant, 7 FT 10 EA 1,740.00$ 17,400.00$ 1,717.52$ 17,175.20$ $1,690.00 16,900.00$
<br />BASE BID TOTAL
<br />Y Y Y
<br />I hereby certify that the above truly and accurately represents bids received for this project on November 24, 2020
<br />
<br />Leslie Biek, PE
<br />Assistant City Engineer
<br />Bid Bond
<br />Ferguson Waterworks
<br />297,676.92$ 322,921.95$ 309,796.30$
<br />Core and Main LP Utility Supply Company
<br />Page 1 of 1
|