My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Coal Line Trail Phase I Proj No. 115-063 - DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Proposal - Coal Line Trail Phase I Proj No. 115-063 - DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 3:34:48 PM
Creation date
1/12/2021 3:31:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend | Coal Line Trail (Phase I) | Construction Engineering Services | 10 <br />PROJECT <br />EXPERIENCE <br />DLZ professionals strive to provide <br />unmatched client service while <br />meeting all of a project’s objectives. <br />The firm’s engineers, architects, <br />planners, and technical support <br />staff are innovative and understand <br />that every project is different. <br />The professionals at DLZ have the <br />experience and expertise to realize <br />that each client’s needs and wants <br />are unique. We approach each <br />project with this in mind and we <br />stand behind the work that we do. <br />LASALLE TRAIL, PHASE III <br />St. Joseph County, Indiana <br />DLZ provided construction engineering <br />services for the extension of the LaSalle Trail <br />shared use path from Auten Road to the <br />Indiana/Michigan State Line. Work included <br />construction of ADA compliant infrastructure <br />with trail being 10 feet wide and hard-surfaced <br />concrete pavement with 2-foot shoulders. The <br />length of the path is 5,700 feet. <br />The path follows the alignment on the existing <br />former railroad bed and aligns with the trail <br />from the previous phase, LaSalle Trail Phase <br />II. Coordination was required to align the path <br />from the south side of State Line Road to the <br />north side with the existing IN-MI River Valley <br />Trail. <br />TAMARACK TRAIL <br />North Liberty, Indiana <br />Construction engineering services were <br />provided for the construction of a new <br />4,600-foot asphalt trail from Quinn Road <br />to Wabash Avenue. The trail connects <br />the North Liberty Community Center to <br />the North Liberty Youth League Ballpark <br />along the abandoned railroad corridor <br />(formerly Indiana, Illinois, and Iowa <br />Railroad). Approximately 2,200 feet of <br />woods were cleared as part of the project. <br />Construction of the project also included <br />subgrade treatment, compacted aggregate, <br />and seeding. Coordination for the project <br />included maintenance of traffic, staging of <br />construction, construction schedule, and <br />material testing.
The URL can be used to link to this page
Your browser does not support the video tag.