My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Letter of Interest - Coal Line Trail Phase I Proj No. 115-063 - VS Engineering Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Letter of Interest - Coal Line Trail Phase I Proj No. 115-063 - VS Engineering Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 3:29:52 PM
Creation date
1/12/2021 3:28:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VS ENGINEERING, INC. | LETTER OF INTEREST • 3 <br />BILL KREGER | PROJECT SUPERVISOR <br />9 YEARS OF EXPERIENCE <br />EDUCATION <br />BROWN MACKIE COLLEGE <br />CERTIFICATIONS <br /> INDOT Field Proficiency <br />(All Categories) <br /> INDOT Site Manager <br />Software <br /> INDOT Certified Technician <br />Bill joined the VS team full time after working for 8 years for the Indiana Department of <br />Transportation (INDOT). He has supervised construction inspection on several projects <br />relating to roadway construction including asphalt resurfacing, asphalt patching, traffic signal <br />rehabilitations, and bridge deck overlays. Bill is an INDOT Certified Technician and is fully Field <br />Proficient. He has also passed the INDOT SiteManager certification training. <br />PROJECT SUPERVISOR EXPERIENCE <br /> Asphalt Resurface (INDOT)—LaPorte District: Contract R-37738 ($4,200,000 Construction <br />Cost) <br /> Signal Rehabilitation (INDOT)—Fort Wayne District: Contract T-36023 ($180,000 <br />Construction Cost) <br /> Asphalt Resurface (INDOT)—Fort Wayne District: Contract RS-34904 ($305,000 <br />Construction Cost) <br /> Asphalt Resurface (INDOT)—Fort Wayne District: Contract RS-38695—3 Des Numbers <br />($3,900,000 Construction Cost) <br /> Asphalt Resurface (INDOT)—Fort Wayne District: Contract RS-39653 ($900,000 <br />Construction Cost) <br /> Asphalt Resurface (INDOT)— Fort Wayne District: Contract RS-39652 ($2,000,000 <br />Construction Amount) <br /> Asphalt Resurface (INDOT)—Fort Wayne District: Contract RS-40829 ($1,800,000 <br />Construction Cost) <br /> Asphalt Patching (INDOT)—Fort Wayne District: Contract RS-41337—5 Des Numbers <br />($1,900,000 Construction Cost) <br />MARK HERALD, PE | PROJECT MANAGER <br />17 YEARS OF EXPERIENCE <br />EDUCATION <br />B.S., CIVIL ENGINEERING <br />INDIANA INSTITUTE OF <br />TECHNOLOGY <br />REGISTRATIONS <br />PE — IN <br />CERTIFICATIONS <br /> INDOT Utility Coordinator <br /> INDOT Certified Technician <br /> ACEC Leadership Training <br />Graduate <br />Mark serves as Project Manager for the firm’s transportation projects. Managing an inspection <br />project requires a different technique than typical projects, and Mark excels in these areas. He <br />understands that various project types may require shifting staff efforts towards the project <br />at hand, which is paramount to its success. Mark’s multitasking skills “kick in” when leading <br />project teams, and he knows how to think with innovation to find the most cost-effective <br />engineering solution for any given scope and budget. Communication—even within this VS Team— <br />must stand out, beginning at the top. Mark is expert at driving timely project input from partners <br />and subconsultants, acting on small issues before they become big problems. <br />CONSTRUCTION PROJECT MANAGEMENT EXPERIENCE <br /> Auburn Road Reconstruction – City of Fort Wayne <br /> Covington Road Trail – City of Fort Wayne <br /> Lake Ave. Roadway Diet – City of Fort Wayne <br /> Argonne Road/Parker Street Corridor – City of Warsaw <br /> Market Street Roadway Design – City of Warsaw <br /> Traffic Signal Preemption – City of Angola <br /> Traffic Signal Preemption – City of Marion <br /> Safe Routes to School – City of Butler <br /> Brian’s Place Extension – City of Kendallville <br /> Fort Wayne Utilities – On-Call Inspection <br /> INDOT Fort Wayne District – On-Call Construction Inspection <br /> I-69 Preventative Maintenance HMA Overlay <br /> US 224 Reconstruction in Decatur <br />PROJE CT MANAGEMENT <br />SOUTH BEND • COAL LINE TRAIL (PHASE I)
The URL can be used to link to this page
Your browser does not support the video tag.