Laserfiche WebLink
190447 NOVEMBER 2020 <br />EXHIBIT A <br />UTILITY EASEMENT SKETCH <br />PROJECT NAME: <br />EXISTING 15' UTILITY EASEMENT <br />EXISTING 40' COMMON ACCESS <br />EASEMENT FOR LOTS 1 & 2 <br />EXISTING 30' SANITARY SEWER <br />EASEMENT FOR LOTS 1 & 2 <br />30' WIDE PERMANENT SEWER EASEMENT <br />LOT 1 CATALDO <br />018-9012-031001 <br />STORM WATER <br />MANAGEMENT <br />EASEMENT <br />LOT 2 CATALDO <br />018-9012-0310 <br />2 EA - PROPOSED SANITARY <br />SEWER SERVICE WYE TO LOT 2 <br />NEW SEWER SERVICE CONNECTION <br />TO PUBLIC SANITARY SEWER <br />SANITARY SEWER <br />WATER MAIN <br />STORM SEWER <br />LEGEND <br />EASEMENT LINE/GRADING PERMIT <br />PROPOSEDEXISTING <br />PRAI <br />RI <br />E <br />A <br />V <br />E. ( <br />S <br />R <br />2 <br />3) <br />PROPOSED SANITARY SEWER, 24" - 36" <br />PROPOSED WATER MAIN, 10" <br />1 inch = ft. <br />0 <br />150 <br />N <br />EXISTING SANITARY LATERAL, 8" TO BE <br />REPLACED BY PROPOSED SANITARY <br />SEWER, 24" - 30" <br />20' WIDE TEMPORARY <br />CONSTRUCTION ACCESS <br />SANITARY LATERAL <br />30' MUNICIPAL SEWER <br />EASEMENT <br />20' TEMPORARY <br />CONSTRUCTION ACCESS <br />RELEASE OF EXISTING 30' <br />SANITARY SEWER <br />EASEMENT FOR LOTS 1 & 2 <br />BY CATALDO