My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6E1
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
11-29-12 Packet
>
6E1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 12:34:02 PM
Creation date
11/27/2012 8:49:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L FAVAVA <br />APPENDIX A <br />SCOPE OF ADDITIONAL SERVICES <br />South Main Street to Lafayette Connector <br />Our Design Agreement was originally based upon our proposal dated August 9, 2010, with the <br />Agreement executed on August 23, 2010. Since that time the Agreement has been <br />supplemented on three times. It was modified two times to add (1) R/W acquisition services <br />and (2) relocation agent services. The third supplemental increase (Submitted on October 12, <br />2011) covered the change in design from the construction of the first project of 3- Phases into <br />one project with revised and additional alignments and traffic signals replacing the initially <br />planned roundabout. At the time of the third Supplemental, increased design fees were <br />projected to carry the project through Construction Contract letting and begin construction. <br />However additional design and coordination tasks have been requested that are beyond the <br />vision available at that time. <br />It is noteworthy to mention that the existing agreement in -place at the time of the first planned <br />contract letting on May 29, 2012 would have substantially covered our increased design costs. <br />However a prudent decision made at that time (to delay the contract letting and construction <br />until 2013) by the City and its design team was instrumental in saving user costs and most likely <br />construction change orders due to wintering the project. This delay resulted in several <br />additional survey, design and coordination tasks including plan revisions to accommodate R/W <br />acquisition changes, additional street lighting, and a separate demolition project. <br />The following items are requested as effort not envisioned in our October 2011 Supplemental <br />Request: <br />Additional Survev Items <br />• Additional field survey. <br />• Field layout of the proposed design to facilitate plan interpretation <br />• Preparation of additional easements and parcel plat revisions. <br />• Supplemental title information requests. <br />Additional Design Tasks <br />• Design and plans for decorative City street lighting. <br />• Analysis, design and plans for an additional detention pond and outlet control <br />structure to serve the Caroline Properties (Gates) development. <br />• Water line extension added on East Barbie Street. <br />• Two additional plan revisions for the Carl Kay Parcel. <br />• Traffic analysis and multiple drive revisions for Lock Joint Tube. <br />• Design of a construction access driveway for Heraeus Kulzer. <br />• Quotation project and documents for a separate demolition contract of three parcels. <br />• Additional survey and design work for West Chippewa (south side). <br />• 2 n Letting and Construction Documents <br />• Wendy's drive revision <br />September, 2012 Page 1 Project File No. 9022.14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.