ENGINEER'S ESTIMATE
<br />CITY OF SOUTH BEND
<br />ApH117. 2012
<br />Project Name: Main 8treeVlahveH Bo I varQ nnector
<br />Project No.: 11ao5e
<br />For Bi0s Due: W212012
<br />BASE 810
<br />ITEM NO. DESCRIPTION
<br />OTY.
<br />UNIT
<br />UNIT PRICE
<br />TOTAL AMOUNT
<br />721 CONTROL STRUCTURE, 60 INCH
<br />1 EACH
<br />$8,000.00
<br />38,000.00
<br />122 INLET, J-10. MOD
<br />38 EACH
<br />$5,202.00
<br />1202,878.00
<br />123 INLET, W 10, MOD
<br />24
<br />EACH
<br />$3,200.00
<br />;76,e00.0p
<br />124 INLET CASTING. TYPE 2
<br />1
<br />EACH
<br />S2,OOD.00
<br />E2,000.00
<br />125 INLET CASTING, NEENAH R- 3067.0, TYPE L GRATE
<br />1
<br />EACH
<br />$500.00
<br />sso6.oD
<br />126 STRUCTURE, ADJUST CASTING TO GRADE
<br />17
<br />EACH
<br />$250.00
<br />54,250.00
<br />127 CAST IN PLACE RETAINING WALL
<br />63.5
<br />SYS
<br />$400.00
<br />525.400.00
<br />128 MODULAR CONCRETE BLOCK RETAINING WALL
<br />18.5
<br />SYS
<br />$450.00
<br />$8.325.00
<br />128 TEMPORARY PANEL SIGN SUPPORTS
<br />108
<br />LET
<br />£1000
<br />£1,080.00
<br />730 STANDARD BARRICADE, TYPE III -A
<br />144
<br />LET
<br />$1000
<br />$1 440.00
<br />131 STANDARD BARRICADE, TYPE III -B
<br />360
<br />LET
<br />515A0
<br />$5.400 00
<br />132 CONSTRUCTION SIGN, TYPE A
<br />22
<br />EACH
<br />$120.00
<br />$2.fiao 00
<br />133 CONSTRUCTION SIGN, TYPE S
<br />1
<br />EACH
<br />£100,D0
<br />Sf00.OD
<br />134 DETOUR ROUTE MARKER ASSEMBLIES
<br />43
<br />EACH
<br />$66.00
<br />$2,795.00
<br />135 ROAD CLOSURE SIGN ASSEMBLIES
<br />8
<br />EACH
<br />$250.00
<br />$2,250.00
<br />136 FLASHING ARROW BOARD
<br />1
<br />EACH
<br />$5D0.00
<br />3500.00
<br />137 TEMPORARY PANEL SIGN
<br />264
<br />SET
<br />$15.00
<br />31,260.00
<br />138 MAINTENANCE OF TRAFFIC
<br />1
<br />LS
<br />$50,000.00
<br />$50,000.00
<br />738 TRAFFIC SIGNAL EOUIPMEM, REMOVE
<br />1
<br />LS
<br />$5,000.00
<br />$5,000.00
<br />140 MISCELLANEOUS EQUIPMENT FOR TRAFFIC SIGNALS
<br />1
<br />LS
<br />$1,000,00
<br />$1,000.00
<br />141 TRAFFIC SIGNAL HEAD, 3 FACE, 121N, RED, AMBER, GREEN
<br />1S
<br />EACH
<br />SODO0D
<br />516200,00
<br />142 TRAFFIC SIGNAL HEAD, 3 FACE, 121N, RED, AMBER ARROW,
<br />GREEN ARROW
<br />2
<br />EACH
<br />395000
<br />$190000
<br />143 TRAFFIC SIGNAL HEAD, 5 FACE, 121N RED, AMBER, GREEN,
<br />AMBER ARROW, GREEN ARROW
<br />q
<br />EACH
<br />$1.400.00
<br />$5,600,00
<br />144 PEDESTRIAN SIGNAL HEAD WITH INTERNATIONAL
<br />SYMSOLS,18', COUNTDOWN
<br />22
<br />EACH
<br />5850.00
<br />518,70000
<br />145 SIGNAL SERVICE
<br />3
<br />EACH
<br />s9oo•00
<br />$z.7010.00
<br />146 POWER SUPPLY, UNINTERRUPTIBLE
<br />3
<br />EACH
<br />$7,500 DD
<br />722.500.00
<br />147 THERMAL VIDEO DETECTOR SYSTEM
<br />8
<br />EACH
<br />$7,000.00
<br />$56,000.00
<br />148 PEDESTRIAN PUSH BUTTON AND SIGN
<br />16
<br />EACH
<br />$175.00
<br />$3,150.00
<br />149 CONTROLLER AND CABINET, MENU DRIVEN, 12 PHASE TS2.
<br />TYPE 1
<br />1
<br />EACH
<br />325.ODO.00
<br />£25,000.00
<br />Prq'W FL@ No 207024.40
<br />Apr0, 2012
<br />
|