ENGINEERS ESTIMATE
<br />CITY OF SOUTH BEND
<br />April 17, 2012
<br />Project Name; Main 3~16fa tta BoulgWid Coo ftM
<br />Project No.: mss
<br />For Bids Due : 512212o12
<br />BASE BID
<br />ITEM N0. I DESCRIPTION
<br />OTY
<br />UNIT
<br />UNIT PRICE
<br />TOTAL AMOUNT
<br />1 DEWATERING AND PROTECTIONOF EXISTING STRUCTURES
<br />2 CONSTRUCTION ENGINEERING
<br />3 CPM SCHEDULE
<br />4 CPM SCHEDULE, MONTHLY UPDATE
<br />1
<br />1
<br />1
<br />13
<br />LS
<br />LS
<br />LS
<br />EA
<br />$5,000.00
<br />594,000.00
<br />f1,250.00
<br />$200,00
<br />fS,00D.DD
<br />594,000.00
<br />$1250.00
<br />$2,600.00
<br />5 MOBILQATION AND DEMOBILQATION
<br />1
<br />LS
<br />5233,000.00
<br />$233.000 00
<br />6 CLEARING RIGHT-OF-WAY
<br />1
<br />L�
<br />$1401000,00
<br />S1410,00D.00
<br />7 PIPE, REMOVE EXISTING STORM SEWER
<br />73
<br />LFT
<br />$1500
<br />$1.095.00
<br />8 PIPE, REMOVE EXIST ING WATER AWN
<br />9 STRUCTURE REMOVE, EXISTING STORM MANHOLE
<br />10
<br />15
<br />LFT
<br />EACH
<br />$15.00
<br />$1.000.00
<br />$150.00
<br />$15,000.00
<br />10 STRUCTURE REMOVE, EXISTING SANITARY MANHOLE
<br />2
<br />EACH
<br />S1,2%.00
<br />$2,400.00
<br />11 REMOVE, EXISTING CAP, 64NCHES
<br />2
<br />EACH
<br />$300.00
<br />1600.00
<br />12 REMOVE, EXISTING CAP, B- INCHES
<br />1
<br />EACH
<br />$350.00
<br />$350.00
<br />13 REMOVE. EXISTING CAP, 1D- INCHES
<br />1
<br />EACH
<br />$50000
<br />$500.00
<br />14 REMOVE. EXISTING FIRE HYDRANT
<br />2
<br />EACH
<br />$1,000.00
<br />$2,000.00
<br />15 ABANDON, EXISTING STORM SEWER
<br />589
<br />LFT
<br />$2000
<br />311,780,00
<br />16 ABANDON, EXISTING SANITARY SEWER
<br />680
<br />LFT
<br />S20.1MD
<br />St3,600.00
<br />17 ABANDON. EXISTING SANITARY MANHOLE
<br />2
<br />EACH
<br />$1,000.00
<br />$2.000.00
<br />18 ABANDON, EXISTING WATER MAIN
<br />485
<br />LFT
<br />$15,00
<br />17,275.00
<br />18 PAVEMENT REMOVAL
<br />100
<br />SYS
<br />$1500
<br />511500.00
<br />20 COMMON EXCAVATION
<br />35,611
<br />CYS
<br />$8.00
<br />$284,888.00 '
<br />21 TEMPORARY EROSION AND SEDIMENT CONTROL
<br />1
<br />LS
<br />$37,009.00
<br />$37,000,00
<br />22 COMPACTED AGGRE GA—E BASE, NO. 53, BASE
<br />9,130
<br />TON
<br />$21 00
<br />$191,730.00
<br />13 COMPACTED AGGREGATE BASE, NO 73, BASE
<br />20
<br />TON
<br />$2100
<br />$(20.00
<br />24 MILLING, ASPHALT, 1.112 INCH
<br />176
<br />SYS
<br />$4.00
<br />s704.00
<br />25 HMA SURFACE, TYPE B
<br />1,390
<br />TON
<br />568.00
<br />594.520.00
<br />16 HMA INTERMEDIATE, TYPE B
<br />2,280
<br />TON
<br />584.00
<br />5145,920.00
<br />27 HMA BASE, TYPE B
<br />7,290
<br />TON
<br />553.00
<br />$3$6,370.00
<br />28 HMA PATCHING, TYPE B
<br />29 ASPHALT FOR TACK COAT
<br />260
<br />19.5
<br />TON
<br />SYS
<br />$100.00
<br />Si-00
<br />$28,000.00
<br />$19.50
<br />39 PLAIN CEMENT CONCRETE PAVEMENT PATCH, B- INCHES
<br />92
<br />SYS
<br />S45.00
<br />$4,140.00
<br />"-$-- Fish• ASSWah, P.C.
<br />P14W File No 101014 40
<br />Awd,, 2012