My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 Minutes 11-8-12 meeting
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
11-29-12 Packet
>
2 Minutes 11-8-12 meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 12:40:06 PM
Creation date
11/27/2012 8:16:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
li <br />South Bend Redevelopment Commission <br />Regular Meeting — November 8, 2012 <br />6. NEW BUSINESS <br />F. South Side Development Area <br />(1) continued... <br />meeting. The modified Plan C -1 adds a left turn lane on Fellows north of Ireland and signal <br />improvements at that intersection and adds sidewalks to both sides of Fellows south of <br />Walter to connect to sidewalks on Ireland. The proposal contains a scope of services to <br />design those elements and also to study traffic calming measures for Fellows and study <br />stopping sign distance for the 3 -way stop sign at Fellows and Teri. The fee for those services <br />is $39,700. Staff requests approval of Resolution No. 3104. <br />Upon a motion by Mr. Varner, seconded by Mr. Downes and unanimously carried, the <br />Commission approved Resolution No. 3104 approving and authorizing the execution of an <br />Amendment to the Addendum to the Master Agency Agreement (Fellows Street Corridor <br />Improvement Project — Supplement #4) <br />(2) Proposal for additional services for Fellows St. Corridor Improvement — Phase H <br />design. <br />Mr. Kain noted that additional services were performed by Christopher B. Burke Engineering <br />beyond what was authorized by the Commission for Supplement #2. Christopher Burke <br />designed multiple options for routing Fellows Street and conducted public meetings. They <br />have incurred additional costs of $68,108. Staff recommends approval of the additional <br />amount. <br />Mr. Downes noted that all that additional work led to a very good outcome. <br />Upon a motion by Mr. Downes, seconded by Mr. Varner and unanimously carried, the <br />Commission accepted the proposal for additional services for Fellows St. Corridor <br />Improvements — Phase II design in the amount of $68,108. <br />G. Northeast Neighborhood Development Area <br />There was no business in the Northeast Neighborhood Development Area. <br />H. Douglas Road Economic Development Area <br />There was no business in the Douglas Road Economic Development Area <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.