My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Engineering Services for Signal Detection Improvements at Seven (7) Intersections - Jones Petrie Rafinski Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Engineering Services for Signal Detection Improvements at Seven (7) Intersections - Jones Petrie Rafinski Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2020 1:19:19 PM
Creation date
12/18/2020 1:19:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COSB-Traffic Signal Detection Improvements <br />November 9, 2020 <br />Page 2 of 2 <br />o Attendance at a pre-construction meeting; <br />o Construction Administration during construction phase, (Time and Expense, Not to Exceed <br />basis). <br />The proposed fees for the understood scope of services as described above are summarized as follows, <br />based on JPR current standard hourly rates for various JPR staff (see attached proposed fee calculation <br />information and current JPR standard hourly rates.) <br />This proposal does not include any of the following services: <br />•R/W acquisition; environmental permitting; INDOT coordination; construction inspection; <br />construction materials testing, <br />•Topographic Survey. Since this project in a on a fast track schedule to get the project bid out by <br />the end of 2020, detailed topographic survey services are not included in this project. GIS data <br />will be utilized for the development of base plans and field checks will be conducted to verify <br />measurements. <br />•ADA curb ramp design. <br />Estimated Total Fees (Time & Materials) =$33,610.00 <br />It is proposed that any desired signal detection improvements added to the scope of work by the City <br />would be proposed by an amendment to the agreement for City review and approval. <br />Thanks very much for contacting JPR on this project. <br />Please contact me with any questions or if you need any additional information. <br />Sincerely, <br />Chris Chockley, PLA, AICP <br />Landscape Architect <br />Certified Planner <br />J:\Proposals\City of South Bend\2020\2020-11-09_Intersection <br />Improvements_JPR.docx
The URL can be used to link to this page
Your browser does not support the video tag.