My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to PSA - Additional Design and Oversee Construction of Bendix Theater Esports Arena - SimplyNew
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to PSA - Additional Design and Oversee Construction of Bendix Theater Esports Arena - SimplyNew
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:41:25 AM
Creation date
12/18/2020 10:06:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT A, consisting of 11 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated January 14, 2020. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: January 14, 2020 <br />b. Owner: City of South Bend <br />Engineer: SimplyNew <br />d. Project: Century Center Esports <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) Additional services to complete design, bidding negotation, and production <br />administration for Phase 1 of the Century Center Esports project. <br />2) Additional services to complete design, bidding negotiation, and production <br />administration for Phase 2 of the Century Center Esports project including Bendix <br />Theater. See attached SimplyNew Design Proposal Phase 2. <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />See attached SimplyNew Design Proposal Phase 2. <br />c. The responsibilities of Owner are modified as follows: <br />See attached SimplyNew Design Proposal Phase 2. <br />d- For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation: <br />1) Additional services to complete design, bidding negotation, and production <br />administration for Phase 1 of the Century Center Esports project for $10,000. <br />2) Additional services to complete design, bidding negotiation, and production <br />administration for Phase 2 of the Century Center Esports project including Bendix <br />Theater for $40,000. See attached SimplyNew Design Proposal Phase 2. <br />e. The schedule for rendering services is modified as follows: <br />Page I. <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.