Laserfiche WebLink
BID TABULATIONProject Name: Guardrail Replacement and InstallationProject No: 118‐084DIVISION 6Item No. Line ItemQuantity UnitUnit PriceCostUnit PriceCostUnit PriceCost1Construction Engineering 1                        LS $2,000.00$2,000.00$3,900.00$3,900.00$1,200$1,200.002CPM Schedule 1                        LS $1,000.00$1,000.00$245.00$245.00$600.00$600.003CPM Schedule, Monthly Update 4                        EA $250.00$1,000.00$100.00$400.00$500.00$2,000.004Maintaining Traffic 1                        LS $5,000.00$5,000.00$3,950.00$3,950.00$1,325.00$1,325.005Video Record 1                        LS $500.00$500.00$200.00$200.00$450.00$450.006Mobilization and Demobilization 1                        LS $1,225.00$1,225.00$7,930.00$7,930.00$7,400.00$7,400.007Guardrail, End Treatment, Remove 1                        EA $100.00$100.00$885.00$885.00$325.00$325.008Guardrail, Remove 125                    LFT $20.00$2,500.00$7.50$937.50$5.00$625.009Guardrail MGS W‐Beam, 6 FT 3 IN Spacing 106                    LFT $20.00$2,125.00$38.00$4,037.50$20.00$2,125.0010Guardrail, Terminal End Section, W‐Beam 1                        EA $300.00$300.00$1,320.00$1,320.00$444.00$444.0011Curb and Gutter, Rolled Curb, Concrete 180                    LFT $0.00$0.00$0.00$0.0012Mobilization and Demobilization for Seeding 1                        EA $500.00 $500.00 $320.00 $320.00 $325.00 $325.0013Mulched Seeding ‘U’ 75                      SYS $3.00 $225.00 $9.75 $731.25 $6.08 $456.0014Gret, Type I 1                        EA $2,000.00 $2,000.00 $2,040.00 $2,040.00 $1,600.00 $1,600.0015Guardrail Reflector 18                      EA $25.00 $450.00 $15.00 $270.00 $12.50 $225.0016W Beam Curved Guardrail 90º Bend, 10’ R 1                        EA $1,500.00 $1,500.00 $735.00 $735.00 $575.00 $575.0017Topsoil, Undistributed 5                        CYS $50.00$250.00$150.00$750.00$425.00$2,125.00DIVISION 6 TOTAL$20,675.00$28,651.25 $21,800.00Non‐Collusion AffadavitSUMMARYDivision 1Division 2Division 3Division 4Division 5Division 6TotalI hereby certify that the above truly and accurately represents bids received for this project on December 15, 2020Finnian Cavanaugh, Project Engineer$21,800.00$209,325.00$304,245.20$305,000.00$58,300.00$39,650.00$21,600.00$60,250.00$103,400.00$20,675.00$61,508.20$21,501.25$18,628.75$62,883.75$111,072.00$28,651.25$39,173.00$13,020.00$22,560.00$48,770.00$65,127.00YesYesEngineer's EstimateNorthern Indiana ConstructionSpecialties CompanyEngineer's EstimateNorthern Indiana ConstructionSpecialties Company\\COSB‐FS1\Share\Public Works\Projects\Projects by Year\2018 Projects\118‐084 Guardrail Replacement and Installation\PROCUREMENT\BIDS AND AWARD\Bid Tabulation 118‐084 12152020.xlsx