Laserfiche WebLink
BID TABULATIONNorth Shore Drive Bank StabilizationProject No: 118-005AFor Bids Due: December 8th, 2020Item No. Description Quantity UnitUnit PriceItem TotalUnit PriceItem TotalUnit PriceItem TotalUnit PriceItem TotalUnit PriceItem Total1 Mobilization and Demobilization1 LS 8,500.00$ 8,500.00$ 7,000.00$ 7,000.00$ 8,500.00$ 8,500.00$ 8,000.00$ 8,000.00$ 12,150.00$ 12,150.00$ 2 Maintenance of Traffic 1 LS 4,000.00$ 4,000.00$ 4,100.00$ 4,100.00$ 3,750.00$ 3,750.00$ 6,000.00$ 6,000.00$ 6,965.00$ 6,965.00$ 3 Construction Engineering1 LS 3,000.00$ 3,000.00$ 3,000.00$ 3,000.00$ 500.00$ 500.00$ 5,000.00$ 5,000.00$ 5,135.00$ 5,135.00$ 4 As-Built Drawing & Reporting1 LS 1,500.00$ 1,500.00$ 1,500.00$ 1,500.00$ 500.00$ 500.00$ 6,000.00$ 6,000.00$ 600.00$ 600.00$ 5 Clearing, Grubbing & Obstruction Removal1 LS 20,550.00$ 20,550.00$ 20,700.00$ 20,700.00$ 44,500.00$ 44,500.00$ 23,000.00$ 23,000.00$ 25,816.20$ 25,816.20$ 6 Class I Riprap800 TON 90.50$ 72,400.00$ 90.25$ 72,200.00$ 106.00$ 84,800.00$ 122.00$ 97,600.00$ 150.00$ 120,000.00$ 7 No. 2 Stone80 TON 80.00$ 6,400.00$ 118.75$ 9,500.00$ 73.50$ 5,880.00$ 110.00$ 8,800.00$ 125.00$ 10,000.00$ 8 Permanent Seeding75 SYS 15.50$ 1,162.50$ 17.00$ 1,275.00$ 26.30$ 1,972.50$ 100.00$ 7,500.00$ 26.30$ 1,972.50$ 9 Bare Root Plantings75 EACH 34.25$ 2,568.75$ 36.00$ 2,700.00$ 21.36$ 1,602.00$ 10.00$ 750.00$ 21.36$ 1,602.00$ 10 Temporary Erosion and Sediment Control1 LS 1,800.00$ 1,800.00$ 3,000.00$ 3,000.00$ 1,300.00$ 1,300.00$ 14,200.00$ 14,200.00$ 9,185.00$ 9,185.00$ 11 Topsoil 40 TON 158.00$ 6,320.00$ 147.50$ 5,900.00$ 70.00$ 2,800.00$ 40.00$ 1,600.00$ 175.00$ 7,000.00$ 12 NAG C700BN Erosion Control Blanket or Equivalent140 SYS 23.25$ 3,255.00$ 95.00$ 13,300.00$ 42.00$ 5,880.00$ 70.00$ 9,800.00$ 51.55$ 7,217.00$ 13 Milling, up to 1.5"650 SYS 9.00$ 5,850.00$ 9.70$ 6,305.00$ 7.25$ 4,712.50$ 13.00$ 8,450.00$ 9.00$ 5,850.00$ 14 HMA Surface, 9.5 mm - Type B 55 TON 167.00$ 9,185.00$ 175.00$ 9,625.00$ 200.00$ 11,000.00$ 180.00$ 9,900.00$ 167.00$ 9,185.00$ 15 Line, Thermoplastic, Solid, Yellow 4"650 LFT 1.45$ 942.50$ 2.00$ 1,300.00$ 2.00$ 1,300.00$ 2.77$ 1,800.50$ 3.00$ 1,950.00$ 16 Line, Thermoplastic, Solid, White 4" 325 LFT 1.45$ 471.25$ 2.00$ 650.00$ 2.00$ 650.00$ 5.54$ 1,800.50$ 3.00$ 975.00$ 17 Concrete Curb, Remove 325 LFT 4.00$ 1,300.00$ 9.85$ 3,201.25$ 10.00$ 3,250.00$ 12.00$ 3,900.00$ 10.00$ 3,250.00$ 18 Concrete Curb, Modified 325 LFT 45.00$ 14,625.00$ 59.08$ 19,201.00$ 35.00$ 11,375.00$ 40.00$ 13,000.00$ 25.40$ 8,255.00$ 19 Guardrail, MGS W-Beam, 6 ft, 3 in. Spacing240 LFT 53.35$ 12,804.00$ 31.50$ 7,560.00$ 34.60$ 8,304.00$ 53.00$ 12,720.00$ 45.00$ 10,800.00$ 20 Guardrail End Treatments2 EACH 1,500.00$ 3,000.00$ 4,550.00$ 9,100.00$ 78.00$ 156.00$ 5,200.00$ 10,400.00$ 2,500.00$ 5,000.00$ 179,634.00$ 201,117.25$ 202,732.00$ 250,221.00$ 252,907.70$ I hereby certify that the above truly and accurately represents bids received for this project on December 8, 2020.Denotes correction by engineerAlicia Pellegrino, Project EngineerThe Stanger Group, Inc.HRP Constrution, Inc. Selge Construction Co., Inc.Base BidYesBid BondYes Yes YesResponsible Bidder QualificationPre-Qualified Pre-Qualified Not all providedBase Bid TotalAcknowledgement of Addendum 1Yes Yes YesNon-Collusion AffadavitYes Yes YesWBE/MBE FormYes YesNorthern Indiana Construction Company, Inc.YesYesYesMet QualificationYesIndiana Earth, Inc.YesYesYesPre-QualifiedYesPage 1 of 1