Laserfiche WebLink
( 2) Switchboards and panel boards <br /> each, new and replaced: <br /> 60 AMP $ 3799 $ 5. 00 <br /> 100 AMP 5 788 7.00 <br /> 200 AMP q 788 9.00 <br /> 400 AMP 18 788 12. 00 <br /> 600 AMP 12:88 15. 00 <br /> Over 600 AMP to 2,000 <br /> AMP 15 788 20.00 <br /> Over 2,000 AMP 29790 25.00 <br /> ( 3 ) Circuits (new or replaced) : <br /> (a) Each circuit 3:88 4.00 <br /> ( 4) Horsepower (machinery) : <br /> (a) First hp 5788 7.00 <br /> (b) Each additional hp. 8728 0.25 <br /> ( 5) Reset and reconnect fees, <br /> each 5788 6.00 <br /> (6) P4see11aneeus-lnspeetlen <br /> fee;-eae1t 5:88 <br /> (7) Each Rre-inspection <br /> fee7-eaeh 187.88 25. 00 <br /> ( 8) Each additional final <br /> inspection 50. 00 <br /> f Sad-fee-sha11-be-ln-add1t1en-te-the <br /> regular-fee+ <br /> If the exact number of circuits or horsepower is <br /> unknown at the time of the application for a permit, a permit may be <br /> taken for the minimum amount known with new permits issued as the <br /> extent of the work known. <br /> (8) Illuminated signs; fees: <br /> a. Free standing signs <br /> shall be calculated for each face measured on the <br /> skeleton framework at the rate of, sq-ft $ 0. 40 sq.ft. <br /> b. Signs flat against <br /> a building shall be calculated per square foot <br /> measured as total area of display surface, sq:ft- 0.40 sq.ft. <br /> c. All installations of <br /> new billboards shall require a permit fee of. . . 85 798 50.00 <br /> SECTION V. Chapter 6, Article 7, is amended as follows: <br /> Sec. 6-36.3 . Permits. <br /> (a) Required in advance. No person shall perform or cause <br /> to be performed the installation of heating, ventilating, air <br /> conditioning or refrigeration equipment or systems without obtaining, <br /> in advance, a permit from the Department. <br /> (b) Fees. Each application for a permit for installation <br /> of heating, ventilating, air conditioning, and refrigeration <br /> equipment or systems shall be accompanied by fees in accordance with <br /> the schedule below. When the total capacity of any system in any <br /> single installation is provided by more than one ( 1) unit, the sum of <br /> the capacities of each unit and the total number of such units shall <br />