Laserfiche WebLink
This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated November 12, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 4 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: November 12, 2018 <br />b. Owner: Board of Public Works. Citv of South Bend, Indiana <br />C. Engineer: Cardno, Inc. <br />d. Project: St. Joseph River Bank Stabilization LARE Feasibility: Riverside Drive at <br />Yukon <br />2. Description of Modifications: <br />a. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />Engineer shall provide construction administration support for the construction phase of <br />the North Shore Bank Stabilization Project. <br />Tasks include: <br />-Preconstruction meeting attendance (1 visit) <br />-Project materials approval <br />-Weekly site visits during construction (Up to 8 visits) <br />-In-field or phone consultation for any special considerations or needed adjustments (Up <br />to 2 visits) <br />-Final inspection and project certification (1 visit) <br />b. For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation: $6,500 <br />Page 1 <br />(Exhibit K— (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright OO 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />