My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Pinhook Well No. 4 Refurbishment Well Cleaning Proj No. 120-061 - Peerless Midwest, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Award Quotations/Proposals
>
Award Quote - Pinhook Well No. 4 Refurbishment Well Cleaning Proj No. 120-061 - Peerless Midwest, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 4:49:42 PM
Creation date
12/8/2020 4:48:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 4/2/2019 Page - 10 Public Works Quote <br />b. Inspect all boxes, crates, and packages upon delivery to Site and notify ENGINEER in writing <br />of loss or damage to products. Promptly remedy loss and damage to new condition per <br />manufacturer’s instructions. <br />c. Keep all products off ground using pallets, platforms, or other supports. Protect steel, packaged <br />materials, and electronics from corrosion and deterioration. <br />5. Warranty: <br />a. Provide manufacturer’s written warranty, running to the benefit of the OWNER, agreeing to <br />correct, at OWNER’s option, remove, or replace materials or equipment specified in this section <br />and found to be defective for a period of three years after date of final completion. <br />6. Design Conditions: <br />Design Condition Well No. 4 <br />Make U.S. <br />Motor Size (hp) and Maximum <br />Speed (rpm) <br />60 hp <br />1800 rpm <br />Motor Voltage/Phase/Hertz 460/3/60 <br />Frame A404UPH <br /> Note: Design conditions correspond to existing motor nameplate information. Refer to Exhibit 4 for <br /> details. <br />7. Contractor shall install an AEGIS Grounding Ring or approved equal. <br />8. Proposed substituted item specifications must be submitted to the Owner and Engineer a minimum <br />of seven (7) days prior to bid opening date. The City of South Bend will determine if substitute <br />product is equal in quality and intent and will issue a statement to the Bidder. <br /> <br />US Motor Replacement Inverter Duty with a Grounding Ring………….LS <br /> <br />XXIV. PUMP MODIFICATION <br /> <br />A. Prevailing Specifications: None <br />B. Additions: <br /> <br />1. Contractor shall reconfigure discharge to install 12” x “8” x “12” T-shaped fitting in the doghouse. <br />a. Contractor shall install 8” blind flange to the T-shaped fitting. <br />2. Valve: <br />a. Contractor shall convert the existing gate valve configuration to a butterfly valve. <br />(i) The butterfly valve shall be provided by the Contractor. <br />(ii) The butterfly valve shall be manufactured by Pratt or an approved equal. <br />b. Remove and salvage existing gate valve. Provide the Owner the salvaged gate valve. <br />c. Valve Installation: <br />(i) Install valves plumb and level unless otherwise approved. <br />(ii) Install valves free from distortion and strain caused by misaligned piping, equipment, or <br />other causes. <br />(iii) Valves shall be installed with sufficient clearance for proper operation of any external <br />mechanisms, and with sufficient clearance to dismantle the valve for in-place maintenance. <br />(iv) Installation shall be in accordance with the valve manufacturer’s recommendations. <br />(v) Butterfly valves shall be installed with the shaft horizontal unless otherwise necessary for <br />proper operation or as acceptable to the Owner. <br />(vi) Position butterfly valves so that they do not conflict with upstream and downstream <br />elements of the piping system or adjacent elements. <br />(vii) Valve actuators and accessories shall be factory mounted on the valve, calibrated, and <br />tested. <br />d. Field quality control: <br />(i) Field test and calibrate equipment to demonstrate to the Owner's representative that all <br />equipment will satisfactorily perform the functions and criteria per manufacturer. <br />(ii) Provide all test apparatus required at no extra cost to Owner. <br />(iii) Follow testing procedures recommended by the manufacturer and approved by the Owner. <br />(iv) All valves shall be free from leaks. Each leak that is discovered within testing shall be <br />repaired by and at the expense of the Contractor. <br /> <br />Reconfigure discharge with butterfly valve, T-shaped fitting, and blind flange.……….…LS
The URL can be used to link to this page
Your browser does not support the video tag.