Laserfiche WebLink
QUOTE TABULATION <br />Edison Well #4 Refurbishment – Well Cleaning <br />Project No: 120-060 <br />For Quotes Due: November 24, 2020 <br />Base Quote <br />Item No.Description Quantity Unit Unit Price Item Total <br />1 Step Drawdown Test 1 LS 900.00$ 900.00$ <br />2 Well Cleaning and Re-development 1 LS 31,550.00$ 31,550.00$ <br />3 Pre & Post Cleaning Video Inpsection of Casing and Screen 1 LS 1,200.00$ 1,200.00$ <br />4 Disassembling and reassembling related to inspection of pump and driver 1 LS 1,000.00$ 1,000.00$ <br />5 US Motor Replacement Inverter Duty with a Grounding Ring 1 LS 11,250.00$ 11,250.00$ <br />6 Miscellaneous Well Components: reconditioning/replacement 1 LS ALLOWANCE 15,000.00$ <br />60,900.00$ <br />Alternate 1 <br />Item No.Description Quantity Unit Unit Price Item Total <br />1 Modify pump to install a flow meter and convert gate valve to a butterfly <br />valve. 1 LS 10,500.00$ 10,500.00$ <br />10,500.00$ <br />Base Quote & Alternate 1 71,400.00$ <br />Becca Plantz, Project Engineer <br />Alternate 1 Total <br />Peerless Midwest <br />Base Quote Total <br />Non-Collusion Affadavit Y <br />Page 1 of 1