Laserfiche WebLink
5. List references from private firms for which you have performed work. <br />Gatlin Plumbing & Heating, Inc. 1111 E. Main St., Griffith, IN Ms. Clara Murphy <br />Gough, Inc. 2200 E. 88t' Dr., Merrillville, IN 46410 Mr. Raymond Gough <br />Dyer Construction Co., 1716 Sheffield Avenue, Dyer. IN Janet Furman <br />Grimmer Construction Co., Inc. 2619 Main Street, Highland, IN Mr. Greg Grimmer <br />SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE <br />1. Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could <br />begin work, completed the project, number of workers, etc. and any other information which you believe would <br />enable the governmental unit consider your bid.) <br />As required by owner <br />2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have <br />performed part of the work) that you have used on public works projects during the past five (5) years along with a <br />brief description of the work done by each subcontractor. <br />See Attached List <br />3. If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be <br />used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a <br />listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed <br />project, you are under a continuing obligation to immediately notify the governmental unit in the event that you <br />subsequently determine that you will use a subcontractor on the proposed project. <br />Will supply upon award of contract <br />QUANTITY ITEM <br />5 Asphalt Plants <br />DESCRIPTION, <br />SIZE, CAPACITY, <br />ETC. <br />CONDITION <br />YEARS <br />OF <br />SERVICE <br />PRESENT LOCATION <br />Various <br />Good <br />Griffith, South Bend, <br />Valparaiso, Lowell, LaPorte <br />19 Asphalt Pavers <br />Various <br />Good <br />Griffith, South Bend <br />4 Sli form Conc. Paver <br />Various <br />Good <br />Griffith, South Bend <br />3 Road Widener <br />Various <br />Good <br />Griffith, South Bend <br />5 Motor Graders <br />CAT/J.D. <br />Good <br />Griffith, South Bend <br />56 Rollers <br />Various <br />Good <br />Griffith, South Bend <br />36 Rubber Tire Loaders <br />Various <br />Good <br />Griffith, South Bend <br />18 Excavators <br />Various <br />Good <br />Griffith, South Bend <br />9 Bulldozers <br />Various <br />Good <br />Griffith, South Bend <br />7 LowBoy Tractors <br />Various <br />Good <br />Griffith, South Bend <br />9 Flatbed Dumps <br />Various <br />Good <br />Griffith, South Bend <br />54 '/2 and 3/ ton PiclaTs <br />Various <br />Good <br />Griffith, South Bend <br />78 1 Ton Crew Trucks <br />Various <br />Good <br />Griffith, South Bend <br />3 Cold Planers <br />Wirtgen 1900 <br />DC <br />Good <br />Griffith, South Bend <br />72 Tri -Axle Dump <br />Mack <br />Good <br />Griffith, South Bend <br />4. What equipment do you have available to use for the proposed project? Any equipment to be used by subcontractors <br />may also be required to be listed by the governmental unit. <br />5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing <br />your proposal? Otherwise, please explain the rationale used which would corroborate the prices listed. <br />Yes, we received quotes from potential subcontractors and suppliers <br />4 <br />