Laserfiche WebLink
<br />Version 2/14/2020 Page - 6 Public Works Quote <br />combination of HMA base, intermediate, and surface course overlaying PCCP and/or brick-type <br />pavers, within the City of South Bend. <br />2. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor’s operations. <br />3. Prior to performing the work of pavement removal at locations shown on the plans or where <br />directed, brick-type pavers and cement concrete pavement to be removed shall be cut with a power <br />driven concrete saw along designated lines. Sawing shall be such that any portion of the pavement <br />to remain in place will not be damaged. Any portion that is damaged or removed outside the <br />designated lines shall be replaced with no additional payment. Sawing of pavement to be removed <br />will not be paid for directly, but shall be included in the cost of pavement removal. <br /> <br />XIX. AGGREGATE PAVEMENTS & BACKFILL <br /> <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 303 <br />B. Additions <br />1. Work to be performed shall include furnishing all labor, services, materials, insurance and <br />equipment to place dense-graded compacted aggregate on prepared subgrade within the City of <br />South Bend. <br />2. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor’s operations. <br />3. The compacted depth of each lift shall be a minimum of 3 in. and maximum of 6 in. <br />4. Compacted Aggregate No. 73 shall be used as the surface course only. <br /> <br /> <br />XX. CURBING <br /> <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 605 <br />B. Additions <br />1. Work to be performed shall include furnishing all labor, services, materials, insurance and <br />equipment for the curb work, of the type specified, within the City of South Bend. <br />2. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor’s operations. <br />3. The cost of excavation, bedding, joint material, and necessary incidentals shall be included in the <br />cost of the pay item in this section. All soft and unsuitable material shall be removed and replaced <br />with suitable material which shall be thoroughly compacted, with no additional payment. <br /> <br />XXI. PLANS <br /> <br />A. Prevailing Specifications: City of South Bend CONSTRUCTION STANDARDS AND SPECIFICATIONS <br />B. Additions: <br /> <br />1. The plans consist of 3 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br /> <br /> <br />