Laserfiche WebLink
r <br />I- <br />STANGER <br />PREVIOUSLY COMPLETED PROJECTS <br />The following is a list of projects The Stanger Group, Inc. has completed in the past 3 years in similar size <br />and scope of work as the North Shore Drive Bank Stabilization project. <br />Bloomingdale Park — Phase 1 <br />r Client: City of Fort Wayne <br />'r Riverbank restoration project including toe wall construction at base of river bank with <br />shot rock, riprap and glacial stone, bank stabilization above the tow wall with erosion <br />control blankets and plant material. Work also included planting of 153 woody plants, <br />384 live stakes and 2,786 plant plugs. <br />Y Contract Amount: $349,000 <br />2. Kasota Island — Phase 1 <br />Y Client: Clear Lake Township Land Conservancy (CLTLC) <br />Kasota Island shoreline was receiving substantial erosion, producing excessive sediment <br />and nutrients to enter the water. We stabilized the banks with a combination of glacial <br />rock toe with encapsulated lifts and native plants. <br />➢ Contract Amount: $99,600 <br />Sincerely,, <br />F <br />Colby Sta ger, President <br />15504 County Road 42 - ustanger@slenvirogroup.com <br />Goshen, Indiana 46528 Phone: (574) 642-3390 www.stenvirogroup.com <br />