Laserfiche WebLink
Section 2 <br />Plan of proposed work <br />1) Set up erosion control items <br />2) Mill asphalt <br />3) Clear trees and brush <br />4) Strip topsoil <br />5) Prep river banks for #2 stone and rip rap <br />6) Place #2 stone and rip rap <br />7) Install soil lifts <br />8) Install landscaping items <br />9) Install concrete curb and asphalt paving <br />Subcontractors Utilized on Past Projects <br />1) Weaver Boos —South Bend, IN, Compaction Testing <br />2) Acorn Landscaping — IUSB West Parking Lot <br />3) Abonmarch—South Bend, IN, Surveying <br />4) Rieth Riley —Goshen, IN, Paving <br />5) Hawk Electric — Merrillville, IN <br />Subcontractors to Utilize on this Project — Possible subs listed, will determine prior to contract approval <br />1) Contractors to be determined <br />List of our Equipment Owned: <br />1) <br />29 Excavators <br />2) <br />6 Dozers <br />3) <br />7 Dump Trucks <br />4) <br />2 Semi Trucks with dump trailers <br />5) <br />6 Rollers <br />6) <br />6 Loaders <br />7) <br />6 Skidsteers <br />8) <br />2 Off Road Haul Trucks <br />9) <br />2 Man Lifts <br />10) 1 Vermer Vac Truck <br />11) Eagle Crusher <br />We have received pricing for services and materials by potential subcontractors. <br />