Laserfiche WebLink
PRELIMINARY Sl'1'E PLAN REQUIREMENTS:City of South Bend,Indiana <br /> Tabulated(listed)Data <br /> 1. Land Coverage: <br /> LAND COVERAGE AREA %OF TOTAL AREA <br /> Total:4.33 acres 188,782 sf 100% <br /> a. buildings(ground floor only) 9,670 sf 5.12% <br /> b. parking&loading,and drives 80,500 sf 42.64% <br /> c. open space(yards,landscaping,etc) 98,612 sf 52.24% <br /> 2. Proposed land uses&floor area(e.g.bank,retail shopping center,office,pizza parlor,apartments) <br /> USE FLOOR AREA %OF TOTAL FLOOR AREA BUILDING HEIGHT <br /> a. Banquet Hall& <br /> Indoor Soccer 9,670 sf 100% 1 story; 21 ft <br /> Total 9,670 sf 100% <br /> For apartments&group units:list number of units;number of bedrooms/unit;estimated population;density <br /> 3. Parking ratios per use as required by ordinance,and number of spaces to be provided. <br /> One(1)space 25 sf of floor area in public use,plus one(1)space per employee;number of spaces required for 9,670 sf of <br /> public use floor area and six(6)employees ...393 spaces <br /> Number of spaces provided... 194 spaces <br /> Total proposed ... . 194 spaces <br /> Number of handicapped 7 spaces <br /> 4. Sewer and water facilities <br /> Current: public water;public sewer series <br /> Proposed: public water;public sewer W <br /> 5. Name of engineer, Danch,Harner&Associates,INC SEP ` 5 2012 <br /> 1643 Commerce drive <br /> South Bend,Indiana 46628 J'-errY <br /> Manned Information(drawn to scale) <br /> 1. North arrow,written and graphic scale,date. <br /> 2. Location of buildings and uses. <br /> 3. Boundaries of property with dimensions. <br /> 4. Location of buildings,uses and easements. <br /> 5. Location and composition of open spaces,landscape planting areas and buffer strips. <br /> 6. Location of parking and loading areas,entry and exit drives. <br /> 7. Abutting public and private streets. <br /> 8. Building and parking setbacks. <br /> 9. Location,height, size and type of sign(s). <br /> 10. Topography and other natural features. <br /> 11. Sanitary,storm sewer,and public water connections;or,private well and septic system locations. <br /> NOTE:additional information may be required during the review process so that the Commission can make an informed <br /> decision. <br />