Laserfiche WebLink
REGULAR MEETING <br />Five Percent (5 %) Bid Bond was submitted <br />BID: <br />OCTOBER 23, 2012 340 <br />Item No. <br />Description <br />Total Amount <br />1 <br />BASE BID: Re- Lighting at Wayne Street Parking Garage <br />$52,983.00 <br />Alt -1 <br />ADD ALTERNATE - 41: Re- Lighting at Main/Colfax <br />$97,150.00 <br />Parking Garage <br />Alt -2 <br />ADD ALTERNATE - #2: Re- Lighting at Leighton Complex <br />$180,556.00 <br />Parking Garage <br />Total of Base Bid and All Add Alternates <br />$330,689,00 <br />UP -1 <br />Add/Delete: Cost per fixture to replace existing fixture with <br />$447.00/$389.00 <br />new type "FA" fixture <br />UP -2 <br />Add/Delete: Cost per fixture to replace existing fixture with <br />$447.00/$389.00 <br />new type "FB" fixture <br />UP -3 <br />Add/Delete: Cost per fixture to replace existing fixture with <br />$415.00/$361.00 <br />new type "FC" fixture <br />UP -4 <br />Add /Delete: Cost per fixture to replace existing fixture with <br />$415.00/$361.00 <br />new type "FD" fixture <br />UP -5 <br />Add /Delete: Cost per fixture to replace existing fixture with <br />$339.00/$295.00 <br />new type "FE" fixture <br />Voluntary <br />Utilize LED fixture in lieu of specified fluorescent fixture. All controls remain as <br />Alternate <br />specified. ADD $67,816.00 to our total bid amount. <br />#1 <br />Voluntary <br />Modify existing fixtures to use LED lamp by eliminating the existing ballast and <br />Alternate <br />using an LED lamp. DEDUCT $36,132.00 from our total bid amount. <br />#2 <br />Voluntary <br />Provide specified fluorescent fixtures and controls, but modify the fixture hanging <br />Alternate <br />method and junction box requirements. We plan to modify the existing fixture <br />43 <br />housings so they would function as a junction box. DEDUCT $25,425.00 from <br />our total bid amount. <br />MEAD & WHITE ELECTRIC / COLIP ELECTRIC <br />P.O. Box 535 <br />Bridgman, Michigan 49106 <br />Bid was signed by: Mr. Chris Grove <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Employment Eligibility <br />Verification, Non - Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was Submitted <br />Five Percent (5 %) Bid Bond was submitted <br />on <br />Item No. <br />Description <br />Total Amount <br />1 <br />BASE BID: Re- bighting at Wayne Street Parking Garage <br />$90,669.00 <br />Alt -1 <br />ADD ALTERNATE - #I: Re- Lighting at Main/Colfax <br />$158,062.00 <br />Parking Garage <br />Alt -2 <br />ADD ALTERNATE - #2: Re-Lighting at Leighton Complex <br />$303,872.00 <br />Parking Garage <br />Total of Base Bid and All Add Alternates <br />$552,603.00 <br />UP -1 <br />Add /Delete: Cost per fixture to replace existing fixture with <br />$687.75 <br />new type "FA" fixture <br />UP -2 <br />Add/Delete: Cost per fixture to replace existing fixture with <br />$687.75 <br />new type "FB" fixture <br />UP -3 <br />Add/Delete: Cost per fixture to replace existing fixture with <br />$652.79 <br />new type "FC" fixture <br />UP -4 <br />Add/Delete: Cost per fixture to replace existing fixture with <br />$652.79 <br />new type "FD" fixture <br />UP -5 <br />Add/Delete: Cost per fixture to replace existing fixture with <br />$568.81 <br />new type "FE" fixture <br />