My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6F(2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
11-08-12 Packet
>
6F(2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:16:59 PM
Creation date
11/5/2012 5:09:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Additional Task 2 - Preliminary Design and Exhibits: CBBEL completed analysis and <br />preliminary design for each of the six alternatives requested by the City. This included exhibits for <br />each of the alternative routes that were presented at the public hearing on August 28, 2012. <br />Additional Task 3 - Modify Preliminary Designs: CBBEL modified the preliminary designs for <br />the three preferred alternatives as requested at the public hearing. This included modification of <br />the original design (Alternative A) to allow five properties originally scheduled for vacation to <br />remain. This modification was named Alternative A -1. The Commission then selected Alternatives <br />A -1 and C -1 for additional study and consideration. <br />Additional Task 4 - Survey and Hearing Notifications: CBBEL delivered two separate surveys <br />and one public hearing notification to the Fellows Street neighborhood residents. The first survey <br />was delivered on September 12, 2012, and the second survey was delivered on October 4, 2012. <br />The public hearing notification was delivered on August 23, 2012. <br />Additional Task 5 - Project Coordination: CBBEL corresponded and conducted several <br />meetings with the City and with the affected property owners. This included several planning and <br />design meetings with City staff during the alternative selection process as well as meeting and <br />corresponding with individual property owners to discuss the project alternatives and answer <br />questions. <br />The fee for this additional work that has been completed is $68,108. We also anticipate needing <br />up to an additional $10,000 to coordinate and resolve issues that may arise with this phase of the <br />project. In the event the additional fee for this phase is not fully needed, the remainder will be <br />applied towards the design services for the recommended alternative. <br />Total Additional Estimated Fee: $78,108 <br />If additional design services are required to complete plans and construction documents for the <br />final alternative, a separate amendment will be prepared. This amendment is subject to the <br />General Terms and Conditions included in the original contract. <br />If the information provided above meets with your approval, please sign this amendment and <br />send a copy back to us as notice to proceed with the additional work. If you have any questions <br />regarding this amendment, please contact me or Jason Durr, P.E. at 574- 282 -8001. <br />Sincerely, <br />Jon D. Stolz, P.E. <br />Manager, Indiana <br />Christopher B. Burke Engineering, LLC City of South Bend Fellows St. Corridor Improvement Phase II <br />19.R110093.00001 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.