ENGINEER'S ESTIMATE
<br />CITY OF SOUTH BEND
<br />April 17, 2012
<br />Project Name : Main Street/_Lafeyette Boulevard Connector
<br />Project No.: 110- 58
<br />For SIds Due 5r2 2J2012
<br />BASE BID
<br />ITEM NO
<br />DESCRIPTION
<br />CITY,
<br />UNIT
<br />UNIT PRICE
<br />TOTAL AMOUNT
<br />150
<br />CONTROLLER AND CABINET, MENU DRIVEN, 12 PHASE TS2,
<br />TYPE 1, WITH LIGHTING
<br />2
<br />- EACH
<br />$30000.00
<br />$60,000.00
<br />151
<br />SIGNAL AND LIGHTING COMBINATION CANTILEVER
<br />STRUCTURE, 40 FT. SIGNAL ARM, 20 FT, LUMINAIRE ARM 35 FT.
<br />1
<br />EACH
<br />$8,400.00
<br />$6,400.00
<br />152
<br />SIGNAL CANTILEVER STRUCTURE, MAST ARMS 40 FT AND 40
<br />FT
<br />1
<br />I
<br />FACH
<br />$81000.00
<br />$8,000.00
<br />153
<br />SIGNAL CANTILEVER STRUCTURE, 40 FT SIGNAL ARM
<br />3
<br />EACH
<br />$2,500.00
<br />$7,500.00
<br />154
<br />SIGNAL CANTILEVER STRUCTURE, 35 FT SIGNAL ARM
<br />1
<br />EACH
<br />$2,000.00
<br />$2,000,00
<br />155
<br />SIGNAL SUPPORT FOUNDATION, 36 IN X 361N X 96 IN
<br />6
<br />EACH
<br />$1,500.00
<br />$9,000.00
<br />156
<br />STEEL STRAIN POLE FOUNDATION, 361N X 144 IN
<br />4
<br />EACH
<br />$2,50100
<br />$10,000.00
<br />157
<br />iCONTROLLER CABINET FOUNDATION, P1
<br />3
<br />EACH
<br />$50090
<br />$1,500.00
<br />158
<br />HANDHOLE, SIGNAL
<br />16
<br />EACH
<br />$50000
<br />$8,000.00
<br />159
<br />INTERCONNECT CABLE, FIBER OPTIC
<br />383
<br />LFT
<br />$2.00
<br />$786.00
<br />160
<br />THERMAL VIDEO DETECTOR CABLE
<br />1,310
<br />LFT
<br />$100
<br />$1,310.00
<br />161
<br />SIGNAL CABLE, 3C18GA
<br />175
<br />LET
<br />$3.50
<br />$612.50
<br />162
<br />SIGNAL CABLE, 3C114GA
<br />100
<br />LET
<br />$2.130
<br />$200.00
<br />163
<br />SIGNAL CABLE, 5CM4GA
<br />3,000
<br />LIFT
<br />$1.75
<br />$5260.00
<br />164
<br />SIGNAL CABLE, 7Cl14GA
<br />1,410
<br />Lf-F
<br />$1.75
<br />$2,467.50
<br />165
<br />SIGNAL CABLE. 2CI16GA
<br />120
<br />LFT
<br />$2.00
<br />$240,00
<br />166
<br />LOOP DETECTOR AMPLIFIER, DELAY, 2- CHANNEL
<br />2
<br />EACH
<br />$800.00
<br />$1,800.00
<br />167
<br />SAW CUT FOR ROADWAY LOOP SEALANT
<br />324
<br />LET
<br />$6.00
<br />$2,592.00
<br />168
<br />SIGNAL DETECTOR HOUSING
<br />2
<br />EACH
<br />$650.00
<br />$1,300.00
<br />169
<br />SIGNAL CABLE. ROADWAY LOOP. 1Ci14GA
<br />1,015
<br />LIT
<br />$100
<br />$1,015.00
<br />170
<br />DISCONNECT HANGER
<br />4
<br />EACH
<br />$350.00
<br />$1,400.00
<br />171
<br />SPAN, CATENARY AND TETHER
<br />4
<br />EACH
<br />$1,750.00
<br />$7,000.00
<br />172
<br />SIGNAL STRAIN POLE, STEEL, 36 FT
<br />4
<br />EACH
<br />$4,950.00
<br />$19.800,00
<br />173
<br />LIGHTING SERVICE FOR TRAFFIC SIGNAL MOUNTED
<br />LUMINAIRES
<br />1
<br />EACH
<br />$460.00
<br />$400,00
<br />174
<br />LUMINAIRE, TRAFFIC SIGNAL MOUNTED, HIGH PRESSURE
<br />SODIUM, 400 WATT
<br />5
<br />EACH
<br />$80000
<br />$4,000.00
<br />175
<br />LIGHTING CABLE FOR TRAFFIC SIGNAL MOUNTED
<br />LUMINAIRES, 3CI10
<br />586
<br />LET
<br />$t 50
<br />$1,027.50
<br />178
<br />CABLE -DUCT MARKER
<br />4 1.
<br />EACH
<br />$100,00
<br />$400.00
<br />177 LIGHTING
<br />HANDHOLE
<br />8 1
<br />EACH
<br />$550.00
<br />$q,40p.00
<br />Prge61 File N. 201024.40
<br />April, 2012
<br />
|