Laserfiche WebLink
ENGINEER'S ESTIMATE <br />CITY OF SOUTH BEND <br />April 17, 2012 <br />Project Name: Main Elreetkafavette BouJ yard Connector <br />Project No.: 710 -058 <br />For Bids Due : 52 12032 <br />BASE 810 <br />ITEM N0, <br />DESCRIPTION <br />OTY, <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />1 <br />DEWATERING AND PROTECTION OF EXISTING STRUCTURES <br />1 <br />LS <br />$5,000.00 <br />$5,000.00 <br />2 <br />CONSTRUCTfON ENGINEERING <br />1 <br />LS <br />$04,00040 <br />$94,000.00 <br />3 <br />CPMSCHEOULE <br />1 <br />LS <br />$1,250.00 <br />$1,250.00 <br />4 <br />CPM SCHEDULE, MONTHLY UPDATE <br />13 <br />EA <br />$200,00 <br />$2,600.00 <br />5 <br />MOBILIZATION AND DEMOBILIZATION <br />7 <br />LS <br />$233,000.00 <br />$233,D00.00 <br />6 <br />CLEARING RIGHT -OF -WAY <br />1 <br />LS <br />$140,000.00 <br />$140.000.00 <br />7 <br />PIPE, REMOVE EXISTING STORM SEWER <br />73 <br />LFT <br />$15.00 <br />$1,085.00 <br />8 <br />PIPE, REMOVE EXISTING WATER MAIN <br />10 <br />LFT <br />$15.00 5750.00 <br />9 <br />STRUCTURE REMOVE, EXISTING STORM MANHOLE <br />15 <br />EACH <br />$1,000.00 $15,000.00 <br />10 <br />STRUCTURE REMOVE, EXISTING SANITARY MANHOLE <br />2 <br />EACH <br />$1,200.00 $2400 00 <br />11 <br />REMOVE, EXISTING CAP, 6- INCHES <br />2 <br />EACH <br />$300.00 $800.00 <br />12 <br />REMOVE, EXISTING CAP, 8- INCHES <br />7 <br />EACH <br />$350.00 5350.00 <br />13 <br />REMOVE, EYOSTING CAP, 10- INCHES <br />1 <br />EACH <br />$60000 $500.00 <br />14 <br />REMOVE, EXISTING FIRE HYDRANT <br />2 <br />EACH <br />$1,000.00 $2,000.00 <br />15 <br />ABANDON, EXISTING STORM SEWER <br />589 <br />LFT <br />$20,00 $11,78000 <br />16 <br />ABANDON, EXISTING SANITARY SEWER <br />680 <br />LFT <br />$20.00 $73,60D.00 <br />17 <br />ABANDON. EXISTING SANITARY MANHOLE <br />2 <br />EACH <br />$1,000.00 $2,000.00 <br />18 <br />ABANDON, EXISTING WATER MAIN <br />465 <br />LFT <br />$15.00 $7,275.00 <br />19 <br />PAVEMENT REMOVAL <br />100 <br />SYS <br />$15.00 $1,500.00 <br />20 <br />COMMON EXCAVATION <br />35,611 <br />CYS <br />$8.DD $284,888.00 <br />21 <br />TEMPORARY EROSION AND SEDIMENT CONTROL <br />1 <br />LS <br />$37,000.00 $37,000.00 <br />22 <br />COMPACTED AGGREGATE BASE, NO. M. BASE <br />9,130 <br />TON <br />$2100 $181.730.00 <br />23 <br />COMPACTED AGGREGATE BASE, NO. 73, BASE <br />20 <br />TON <br />$21.DD $420.00 <br />24 <br />MILLING, ASPHALT, 1 -1V INCH <br />176 <br />SYS <br />$4.00 $704.00 <br />25 <br />HMA SURFACE, TYPE B <br />1,390 I <br />TON <br />$68.00 $94,520.00 <br />26 <br />HMA INTERMEDIATE, TYPE B <br />2,280 <br />TON <br />$64.00 $145,920.00 <br />27 <br />HMA BASE, TYPE 8 <br />7,290 <br />70N <br />$53.00 $385,370.OD <br />28 HMA <br />PATCHING, TYPE B <br />280 <br />TON <br />$100.00 $25,000 -00 <br />29 ASPHALT <br />FOR TACK COAT <br />19.5 <br />SYS <br />$1 DO $19.50 <br />30 PLAIN <br />CEMENT CONCRETE PAVEMENT PATCH ,B- INCHES <br />92 <br />SYS <br />$45.GO $4,140.00 <br />LMsm- Fisher Asstvv bWs P.C, <br />PrW d File Na. 201024.40 <br />Aprd,, 2017 <br />