<br />{ GULAR 1ViEETING AI~RIL 14, 2004 _R _~._
<br />
<br />tNo. ,. ~flg~ qty Unlt Urilt hr3 CC Total Amount
<br />I. 3a p~&ll ~loclc (5 or Dore
<br />properties) 1 L~'T
<br />X45.00
<br />X45.00
<br /> '~~ l Lot 400 LI~T X95.00 $34,000.00
<br />~u~
<br />No. I' nm City ITnit Unit price Total oust
<br />4 , Alley Approach 50 SYS X65.00 $3,175.00
<br />~ ~Iandicap Rarnp 50 SYS $130.00 $6,500.00
<br />~ Trip ~Iazard 25 SYS X20.00 X500.00
<br />I Tota l Cost X154,745.00
<br />a ~A EID - I LAND ROAD AND lVIIAI~II ST ET INTERSECTION
<br />Carl I~. Littrell, City Engineer, advised the Eoard that on March 10, 2004, bids were received
<br />~>pened for the above referred to project. After reviewing those bids, li~Ir. Littrell
<br />orr~rnends that the Hoard award the contract to the lov~~est responsive and responsible bidder,
<br />~olcs Construction Company Inc., 625 South Eeiger Strcct, 1Vlishawalca, Indiana 46544 in the
<br />_~t of the Base 13id of X1,003,592.17 and Alternate ~ in the amount of X145,454.20.
<br />T". .- fore, ~/Ir. Gilot made a motion that the recommendation be accepted and the bid be
<br />~{ed as outlined above. 1l~Ir. Littrell seconded the motion, which carried.
<br />~ 107-023 WATER WO S ~OND~
<br />. ~"ilot advised that 1~Ir..Iol~x~ Wiltrout, Water Works, has submitted Change Order No. 3 on
<br />rv of Casteel Construction, indicating the Contract amount be increased by X1,544.00 for a
<br />nee ~ Contract sum, inclaading this Change Order, in the al~nount of X540,446.40. Upon a motion
<br />madc by 1VIr. Littrell, seconded by 1VIr. Inks and carried, tl~e Change Order was approved.
<br />~~,ATION #2 - I~ROJECT NO. 106-002 (COIT~
<br />. '"ilot advised that 1VIr. Toy Villa, Engineering, has sribmitted the Certification of Substantial
<br />, Ietion on behalf of I3ro ~ Brown General Contractors, for the abovc referenced project.
<br />,.~o a lnotion made by l~Ir. Gilot, seconded by ~Ir. Littrell and carried, the Certificate of
<br />„~ntial Completion was approved.
<br />~~~I~I~I~:OVE PROJECT COIvII'LETION Ap'~'IDAVIT - ENG~fIAN NATATORIUIi~
<br />WASI-IINGTON TIF)
<br />i~~tr. ~'" t advised that 1~1Ir. Toy Villa, Engineering, has submitted the Project Completion
<br />Aftida on behalf of Laser Spralcer Construction, for the above rcfcrenced project, indicating a
<br />t`~nal cost of X294,450.00. Upon a motion madc by I~r. Ii~lcs, seconded by 1~Ir. Littrell and
<br />carried, the Project Completion Affidavit was approved.
<br />~DO]PT ~ SOLUTION NO. 16-2004 - A ~ SOLUTION CON~'I ING ACOUISIT~ON Off'
<br />I~ROI~ERTY fN TPIE CITY O~ SOUTI~ BEND, INI3Il~NA (NAPOLEON ST ET -LOT 31)
<br />~Jpon a motion made by lYlr. Inks, seconded by I04r. Littrell and carried, the following Resolution
<br />wa.s adopted by the Board of Public Worl~se
<br />SOLUTION NO. 16-2004
<br />A SOLUTION CONI'I ING ACQUISITION Of
<br />PROPERTY IN TIE CITY OP SOUTPI EENI), INI~IAN1~
<br />{NAPOLEON ST ET -LOT 3 ~ ~
<br />
|