My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/08 and 3/24/08 Board of Public Works Regular Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2008
>
03/20/08 and 3/24/08 Board of Public Works Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2008 2:54:30 PM
Creation date
5/5/2008 3:23:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/24/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C~~JLAIZ Ii~IEETINCs I~IAI~CFI 24g 200 <br />'.. ~1~ne _..... ______ <br />Concrete Curb ~ oval a lace ent <br />No. Ite Qty iJnit Unit Price Total Amount <br />1 a Full block (5 or More 1 LFT <br /> Properties) $45.00 $45.00 <br />l Fu11 Lot 500 LFT $45.00 $22,500.00 <br />Concrete Sidewalk a ®~al a lace ent <br />No. Item Qty Unit Unit Price Total Amount <br />2a Fu11131ock (5 or 104ore 1 LFT <br /> Properties) $36.00 $36.00 <br />2 Full Lot 2700 LFT $36.00 $97,200.00 <br />Co iati®n -Cur and Sidewalk a®val apiece ant <br />No. Ite Qty Unit Unit Price Total Amount <br />3a Fu11131ock (5 or More 1 LFT <br /> Properties) $105.00 $105.00 <br />3b Full Lot 400 LFT $105.00 $42,000.00 <br />iscelane®us <br />No. Item Qty Unit Unit Price Total Amount <br />4 Alley Approach 50 SYS $112.00 $5,600.00 <br />5 FIandicap IZ p 50 SYS $10.00 $9,000.00 <br />6 Trip I-Iazard 25 SYS $95.00 $2,375.00 <br />Total Cost $17,861.00 <br />oa~e 1 _ _ i <br />Concrete Curb e ®val ~ e lace ant <br />No. Ite Qty Unit Unit Price Total Aflnount <br />i a Full dock (5 or More 1 LFT <br /> Properties} $ N® III <br />lb Full Lot 850 LFT $ N® ~II3 <br />Concrete Sidewalk e ®~al a lacerri ent <br />No. Item Qty L7nit Unit Price Total Amount <br />2a Full dock (5 or l~lore 1 LFT <br /> Properties) $ N® SID <br />2b Full Lot 2200 LFT $ N® III <br />Ct~ inati®n -Curb and Si ewalk 12em®val e lace ant <br />~I No. Ite Qty Unit Unit Price Total Amount <br />3a Full dock (5 or 1Vlore 1 LFT N® ~II~ <br /> Properties) $ <br />3b Full Lot 650 LFT $ N® ~II~ <br />iscellane~us <br />_ No. Ite Qty Unit Unit Price Total Amount <br />4 Alley Approach 50 SYS $ N® II7 <br />5 I-I dicap IZ p 50 SYS $ NC BIL) <br />6 Trip Lazard 25 SYS $ N® IIJ <br />Total Cost NC ~II7 <br />1. F, ;_. <br />4-1 _.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.