Laserfiche WebLink
GULAR Ii~IEETING <br />~'~~* <br />r <br />ARCFI 24, 200 <br />1SC811~I1~®i15 <br />No. Item Qty Unit Unit Price Total Arno t <br />4 Alley Approach 50 SYS X65.00 X3,250.00 <br />5 I-Iandicap Ramp 50 SYS ~~5.00 ~4,2~0.00 <br />6 Trip FIazar 25 SYS X24.00 X600.00 <br />Tota l Cost X159,064,00 <br />Upon a motion made by l~Ir. Littrell, seconded by Mr. Inks and carried, the above bids <br />were referred to the Engineering Department for review and recommendation. <br />OPENING AND AWA ®F EID - TRUCKING __ C7F FELT P SSED <br />G&IVI) <br />This was the date set for receiving and opening of sealed bids for the above referred to <br />project. The Clerk tendered proofs of publication of Notice in the South 13cnd Tribune <br />and the Tri-County News, which were found to be sufficient. The following bid was <br />opened and publicly read: <br />'T IJCI~ ITS <br />23942 State Road 2 <br />South fiend, Indiana 46619 <br />Eid was signed by: r. James Eurger <br />Non-Collusion Affidavit was in order <br />Non-Discrimination commitment form was completed <br />Ten percent (10%} Eid fond was submitted <br />EID: <br />Ite I~o® to ty Unit Price <br /> Per cur <br />1 Ii~Ionday Through Friday Per Truck $5.00 __._ <br />2 Saturday Per Truck X97.00 <br />3 Sunday Per Truck ~ 110.00 <br />®PENING DF SIDS - 200 ®R NEWER TW® WFIEEL DRIVE SUV P®LICE <br />This was the date set for receiving and opening of sealed bids for the above referred to <br />project. The Clerk tendered proofs of publication of Notice in the South Bend Tribune <br />and the Tri-Co ty News, which were found to be sufficient. The following bid was <br />opened and publicly read: <br />IBS C EV I.'T C ME CI~1Ia <br />1 X00 U.S. 31 y-Pass South <br />P.®. fox 2169 <br />Kokomo, Indiana 46904-2169 <br />Eid was signed by: IVIr. Neil 1Vlunsey <br />Non-Collusion Affidavit was in order <br />Non-Discrimination commitment fo was completed <br />Ten percent (10°/®} Eid Bond was submitted <br />