My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Laurel Woods Drainage Improvements Design – McCormick Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Laurel Woods Drainage Improvements Design – McCormick Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 7:16:03 PM
Creation date
11/24/2020 7:14:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 6 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Contract Documents. Engineer shall not, during such visits or as a result of such <br />observations of Contractor’s Work in progress, supervise, direct, or have control over <br />Contractor’s Work, nor shall Engineer have authority over or responsibility for the <br />means, methods, techniques, sequences, or procedures of construction selected or used <br />by Contractor, for security or safety at the Site, for safety precautions and programs <br />incident to Contractor’s Work, nor for any failure of Contractor to comply with Laws <br />and Regulations applicable to Contractor’s furnishing and performing the Work. <br />Accordingly, Engineer neither guarantees the performance of any Contractor nor <br />assumes responsibility for any Contractor’s failure to furnish or perform the Work in <br />accordance with the Contract Documents. <br />8.Defective Work: Reject Work if, on the basis of Engineer’s observations, Engineer <br />believes that such Work (a) is defective under the standards set forth in the Contract <br />Documents, (b) will not produce a completed Project that conforms to the Contract <br />Documents, or (c) will imperil the integrity of the design concept of the completed Project <br />as a functioning whole as indicated by the Contract Documents. <br />9.Clarifications and Interpretations; Field Orders: Issue necessary clarifications and <br />interpretations of the Contract Documents as appropriate to the orderly completion of <br />Contractor’s work. Such clarifications and interpretations will be consistent with the intent <br />of and reasonably inferable from the Contract Documents. Subject to any limitations in the <br />Contract Documents, Engineer may issue field orders authorizing minor variations in the <br />Work from the requirements of the Contract Documents. <br />10.Change Orders and Work Change Directives: Recommend change orders and work <br />change directives to Owner, as appropriate, and prepare change orders and work change <br />directives as required. <br />11.Shop Drawings and Samples: Review and approve or take other appropriate action in <br />respect to Shop Drawings and Samples and other data which Contractor is required to <br />submit, but only for conformance with the information given in the Contract Documents <br />and compatibility with the design concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents. Such reviews and approvals or other action will <br />not extend to means, methods, techniques, sequences, or procedures of construction or to <br />safety precautions and programs incident thereto. Engineer shall meet any Contractor’s <br />submittal schedule that Engineer has accepted. <br />12.Substitutes and “or-equal”: Evaluate and determine the acceptability of substitute or “or- <br />equal” materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02.A.2 of this Exhibit A. <br />13.Inspections and Tests: Require such special inspections or tests of Contractor’s work as <br />deemed reasonably necessary, and receive and review all certificates of inspections, tests, <br />and approvals required by Laws and Regulations or the Contract Documents. Engineer’s <br />review of such certificates will be for the purpose of determining that the results certified <br />indicate compliance with the Contract Documents and will not constitute an independent <br />evaluation that the content or procedures of such inspections, tests, or approvals comply
The URL can be used to link to this page
Your browser does not support the video tag.