Laserfiche WebLink
This is EXHIBIT K, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated Dec 12, 2017. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. _3 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: Dec 12, 2017 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: SmithGroup Inc. (Formerly SmithGroupJJR Inc.) <br />d. Project: Seitz Park Reconstruction, South Bend Project No. 117-093 <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) Perform Task 4: Implementation for Architectural Services as previously described <br />in Attachment A to attend Construction Meetings and Site Observations, review <br />Submittals and RFIs and prepare Closeout and Record Drawings. <br />2) The scope of services is for revised Phase 1 Bid Packages that includes the North <br />Riverwalk, Seitz Park and the East Race Floating Dock Replacement. <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />1) The anticipated construction duration is estimated to be sixteen months, March <br />2021 through June 2022. <br />2) Task 3 Modifications: SmithGroup previously completed design and construction <br />documentation for a pedestrian connection from Jefferson Bridge to the South <br />Riverwalk and widen Riverwalk to improve access and visibility at this location <br />that was included in the original Phase 1 bid documents issued dated 12/19/2019. <br />SmithGroup assisted the City in exhibits and supporting documentation in their <br />acquisition proceedings for the widen Riverwalk & pedestrian connection. <br />SmithGroup also provided and will continue to provide continued support <br />coordinating with other adjacent property owners and developments. <br />3) Task 4 Modifications: The SmithGroup Team will attend weekly OAC meetings <br />via web-ex/video conference calls with one (1) in -person meeting per month <br />allocated to coincide with a construction site visit. A total of sixteen (16) site visits <br />are included within Phase 1 Bid Package scope of services. <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />