Laserfiche WebLink
Date Performed Invoice #Company Cost Description Date Billed <br />6/17/2020 2080337 Badger 1,305.00$ Pothole for forcemain 7/8/2020 <br />6/17/2020 112601 Carothers Printing Company 62.60$ T&M Tracker 6/17/2020 <br />6/19/2020 0204960 Ferguson 525.00$ 14" Fittings 6/29/2020 <br />6/19/2020 9172 R&R Visual 950.00$ Camera Sewer 6/25/2020 <br />6/19/2020 0204962 Ferguson 4,170.00$ 14" Forcemain parts 6/19/2020 <br />6/19/2020 145226 Midwest Tile & Concrete 5,958.00$ Concrete Structures 6/23/2020 <br />6/19/2020 1166116 Big C Lumber 68.46$ Material for Bypass 7/6/2020 <br />6/22/2020 0204953 Ferguson 4,225.00$ Partial order of 36" pipe 6/29/2020 <br />6/23/2020 0204953-1 Ferguson 13,520.00$ remainder of 36" pipe 6/29/2020 <br />6/23/2020 1456998 Ozinga 550.00$ Concrete Collar at Existing STR.6/29/2020 <br />6/23/2020 0204955 Ferguson 1,160.40$ Lateral Hookup Material 6/29/2020 <br />6/24/2020 0204951 Ferguson 1,450.00$ 14" Tee with MJ 6/29/2020 <br />6/24/2020 0205329 Ferguson 136.50$ 6" Pipe for Lateral connections 6/29/2020 <br />6/25/2020 0205588 Ferguson 235.00$ Repair unmarked 1" water service 6/29/2020 <br />6/25/2020 6272020 V&R Trucking 175.00$ Haul off Material 6/29/2020 <br />6/30/2020 0206238 Ferguson 338.00$ 24" Pipe to connect to 21" Gravity 7/6/2020 <br />6/30/2020 0206094 Ferguson 6,748.80$ 12" Reroute for Concrete Encased WM 7/6/2020 <br />6/30/2020 202006-0738 Klink 3,440.16$ No 8 Gravel 7/10/2020 <br />7/1/2020 202007-0131 Klink 397.38$ No 8 Gravel 7/17/2020 <br />7/1/2020 0206298 Ferguson 1,856.60$ Parts for Completing 12" Reroute 7/6/2020 <br />7/1/2020 1463622 Ozinga 1,064.00$ Concrete Collars for New STRs.7/13/2020 <br />7/2/2020 1465222 Ozinga 2,620.00$ Concrete Collars for New STRs.7/17/2020 <br />7/2/2020 1465223 Ozinga 6,900.00$ Slurry for 36" Pipe Abandonment 7/17/2020 <br />7/6/2020 1465408 Ozinga 624.00$ Flow Fill around new 12" Watermain 7/17/2020 <br />7/7/2020 0206298-1 Ferguson 681.60$ 12" pipe for Watermain Reroute 7/17/2020 <br />7/7/2020 0206833 Ferguson 1,032.00$ Equipment to flush Bypass System 7/17/2020 <br />7/7/2020 0206743 Ferguson 107.00$ Valve Box for new 12" Valve at Intersection 7/17/2020 <br />7/8/2020 0206764-1 Ferguson 107.00$ Additional Valve Box for existing 6" Valve 7/13/2020 <br />7/10/2020 0207249 Ferguson 750.00$ MH Castings for New Structures 7/16/2020 <br />7/13/2020 0207454 Ferguson 28.00$ Material for Laterals 7/17/2020 <br />7/13/2020 0207385 Ferguson 80.00$ Material for service in the way of sewer 7/17/2020 <br />7/14/2020 0207554 Ferguson 408.00$ Manhole Riser Rings and new flat top 7/20/2020 <br />7/16/2020 0207953 Ferguson 330.00$ Manhole Riser Rings for Existing Strs.7/20/2020 <br />7/19/2020 8671 Best Sweep 171.00$ Sweep the South and East end of the Job 7/29/2020 <br />7/21/2020 0207347 Ferguson 810.00$ 14" Pipe to restock SB Water 7/23/2020 <br />Total Material Cost 62,984.50$ <br />Created on 8/4/2020 <br />2520 CORBY & IRONWOOD 36 INCH SEWER REPAIR MATERIAL COST REPORT