My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Emergency Sewer Repair Work - Emergency Sewer Work due to Existing 36” Sewer Main Deterioration & Manhole Replacement – HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Emergency Sewer Repair Work - Emergency Sewer Work due to Existing 36” Sewer Main Deterioration & Manhole Replacement – HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:58:10 AM
Creation date
11/24/2020 7:12:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Midwest Tile and Concrete Products, Inc. <br />4309 Webster Road CONCRETE PRODUCTS,INC. INVOICE 145226 <br />Woodburn, IN 46797 Invoice Date: 6/19/2020 <br />Phone: (260) 749-5173 <br />Fax: (260) 493-2477 <br />Sold to: HRP010) <br />/ �dblfumber: 20-3693 <br />HRP CONSTRUCTION Cf% �J� SEtipgp; CORBY & IRONWOOD EMERGENCY <br />5777 CLEVELAND RD. �'�"�`` `�"-' <br />CORBY & IRONWOOD <br />SOUTH BEND, IN 46628 South Bend, IN <br />Make checks payable to Midwest Tile & Concrete Products <br />SHiPDATA <br />TRt�tdi4 iliSir63 Loyd # <br />i RAIttT <br />- - PRCE" <br />6/19/2020 <br />Allan Mack 2074 <br />1 <br />TWt4 .. <br />_ <br />NET 30 NH <br />01 <br />145226 <br />Qty <br />UOM <br />Item <br />Description <br />Weight <br />Unit Price TX <br />Extension <br />Structure: <br />24X3 RR <br />2 <br />EA <br />MH2160 <br />MH RISER RING 24 X 3 IN (14/PA Liet) <br />122 <br />$29.00 ❑ <br />$58.00 <br />Structure <br />Total <br />$58 00 <br />Structure: <br />SAN 1 <br />72" Storm Manhole <br />1 <br />EA <br />MH72BASE <br />VF BASE 64" <br />11,668 <br />$1,628.09 ❑ <br />$1,628.09 <br />1 <br />EA <br />MH48S32 <br />MH 48 SECTION X 32 IN <br />2,314 <br />$203.41 ❑ <br />$203,41 <br />1 <br />EA <br />MH2186 <br />MH 48 SECTION X 12 IN <br />868 <br />$151.99 ❑ <br />$151.99 <br />1 <br />EA <br />MH5719 <br />MH 48 CONE X 36 IN <br />2,260 <br />$227.41 ❑ <br />$227,41 <br />2 <br />EA <br />MA1.510 <br />BIDCO C-56 1 1/4 X 14.5 (5 ROLLS P1BOX) <br />14 <br />$14,32 ❑ <br />$28.64 <br />CONSEAL <br />3 <br />EA <br />MA341 <br />BIDCO C-56 1 in X 14 ft 6 in 8 ROLLS P BOX <br />18 <br />$14.74 ❑ <br />$44.22 <br />2 <br />EA <br />MHA1062 <br />HOLE A <br />0 <br />$85 71 ❑ <br />$171 42 <br />1 <br />EA <br />MH72TRANS <br />MH 72 TRANSITION LID X 48 IN - 3208# <br />3,208 <br />$494.82 ❑ <br />$494,82 <br />Structure <br />Total <br />$2,950.00 <br />Structure: SAN 2 <br />72" Storm Manhole <br />1 <br />EA <br />MH72BASE <br />VF BASE 96" <br />15,996 <br />$1,929.37 ❑ <br />S1,929.37 <br />1 <br />EA <br />MH2186 <br />MH 48 SECTION X 12 IN <br />868 <br />$133.23 ❑ <br />$133.23 <br />1 <br />EA <br />MH2200 <br />MH 48 CONE X 32 IN <br />2,175 <br />$177.31 ❑ <br />$177.31 <br />2 <br />EA <br />MA1.510 <br />BIDCO C-56 1 1/4 X 14.5 (5 ROLLS P/BOX) <br />14 <br />$12,55 ❑ <br />$25.10 <br />CONSEAL <br />2 <br />EA <br />MA341 <br />BIDCO C-56 1 in X 14 ft 6 in 8 ROLLS P BOX <br />12 <br />$12.92 ❑ <br />$25.84 <br />3 <br />EA <br />MHA1062 <br />HOLE A <br />0 <br />$75.13 ❑ <br />$225.39 <br />1 <br />EA <br />MH72TRANS <br />MH 72 TRANSITION LID X 48 IN - 3208# <br />3,208 <br />$433.76 ❑ <br />$433.76 <br />Structure Total <br />$2,950.00 <br />A 1 1/2% per month service charge is added to all past due invoices. This is an 18% annual percentage rate. <br />Any items/structures that are special order and non -stock are not eligible to rerurn for credit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.