Laserfiche WebLink
CLIENT: 305 W. Jefferson Blvd. PROJECT: South Bend, IN 46601SHEET 8 of 8No.Total Total Shts. Principal PM - PE Proj. Engr-PE Staff Engr CAD Tech Land. Arch. Hours CostSetup Base Drawing 4 4Cover Sheet1 1 2Preliminary Geometric Layout4 12 161648Preliminary Intersection Details48820Storm Sewer Design246Preliminary Quality Control111350% Cost Estimate124750% Design Review Meeting with City1113Field Check145Utility Coordination123Traffic Analysis816Total Hours1154139290125Cost per Hour$215.00 $160.00 $130.00 $100.00 $80.00 $110.00Total Cost by Classification$215.00 $2,400.00 $5,330.00 $3,900.00 $2,320.00 $0.00Design Total$14,165.00Budget$14,200.00APPENDIX "A-1"Phase 4 - South Bend Avenue and Frances StreetDesignStaffhour JustifcationAbonmarche Consultants, Inc.City of South BendHoward Street Conceptual DesignOctober 27, 2020DESCRIPTIONSTAFFHOURS BY CLASSIFICATION