My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - St. Joseph Backwater Valves Proj No. 119-018 - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order No 1 - St. Joseph Backwater Valves Proj No. 119-018 - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 7:06:15 PM
Creation date
11/24/2020 7:05:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/24/2020
Highlight
ID:
1
Creator:
Created:
11/24/2020 7:06 PM
Modified:
11/24/2020 7:06 PM
ID:
2
Creator:
Created:
11/24/2020 7:06 PM
Modified:
11/24/2020 7:06 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />Josh Ehmer <br />Subject:FW: Check Valves <br />Attachments:36 Series TF1 with Thimble Plate on 48 SQ 20 hole.pdf; 42 Series TF1 42.0 OD.pdf; Series 35 <br />35-1Check Valve.pdf; Series TF-2 and TF-1 IOM.pdf; Wall Thimble Plates.pdf; Selge Sketches.pdf <br />From: Justin Butler <jbutler@selgeconstruction.com> <br />Sent: Thursday, February 20, 2020 2:07 PM <br />To: Jacob Klosinski <jklosins@southbendin.gov> <br />Cc: Josh Ehmer <jehmer@southbendin.gov>; Toy Villa <tvilla@southbendin.gov> <br />Subject: Check Valves <br /> <br />Jacob, <br /> <br />Per our conversation today, I have attached all the information for the two options for the check valves. <br /> <br />Option 1 – Per Bid <br /> <br />Provide series 35‐1 Check Valves with Flange’s. 12‐14 week lead time from release to production. <br /> <br />Option 2 <br /> <br />Provide Series TF‐1 Check Valves with 304 SS Thimble Plate. The total cost add to the project would be $10,813.00/LS. <br />Lead time for option 2 is 24 weeks from release to production. <br /> <br /> <br />I have attached field measurements that I took of each structure. Let us know how you would like to proceed. Either way <br />is fine with us. <br /> <br />Also, below is the email I received from BL Anderson it may be helpful in making your decision. Thanks! <br /> <br />“Justin, <br />Thanks for your conversation this morning! I have included the Installation, Operation & Maintenance Manuals for <br />Tideflex’s Series 35/35‐1 & Series TF‐2/TF‐1 along with an Application Data sheet for the wall thimble plate (Tideflex <br />does supply the large rubber gasket between the headwall and the thimble plate). <br /> <br />I have also included a sample drawing for a 36” TF‐1 with thimble plate and unfortunately I do not have one for a 42” TF‐ <br />1 with thimble plate, but included the 42” TF‐1 by itself (please see note from Nichole at the factory…). NOTE – since <br />these thimble plates are fabricated, we can modify the plate design for the application. Therefore, if their standard <br />plate design does not fit, please provide a sketch or hand drawn design that will work for your application and we can <br />see if they can manufacture. All orders will require a Submittal for Approval before being released to manufacturing… <br /> <br />Tom, <br /> <br />I do not have prelim drawings for those sizes. We will have to do a PO for Hold for approval to get drawings. Sorry <br /> <br /> <br /> <br /> <br />Justin Butler <br />Director- Business Operations, Selge Construction Co., Inc. <br />269-684-0842 | www.selgeconstruction.com
The URL can be used to link to this page
Your browser does not support the video tag.