My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Pinhook Well No. 4 Refurbishment Proj No. 120-061 - Peerless Midwest, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Pinhook Well No. 4 Refurbishment Proj No. 120-061 - Peerless Midwest, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 7:02:59 PM
Creation date
11/24/2020 7:01:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 4/2/2019 Page - 9 Public Works Quote <br /> <br />XXI. PUMP AND DRIVER INSPECTION <br /> <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. Included in this scope is removing the complete pump and driver that are currently installed in the <br />well. This equipment shall be disassembled by an OEM approved pump repair facility for inspection <br />and reporting on the condition of all components. A representative of the City of South Bend will <br />visually inspect the equipment to discuss the repair work that shall be completed. The cost to <br />disassemble the equipment and reinstall back in the well shall be included in this bid. The cost of <br />repair shall be handled as an alternate as the condition of the equipment is not known at this time. <br />The City understands that the cost is subject to the condition of the pump and driver. <br />2. Payment for all work included in the disassembly and the assembly of equipment required to <br />inspect the condition of the pump and driver shall be made as a lump sum as specified in the <br />proposal as follows: <br /> <br />Disassembling and reassembling related to inspection of pump and driver ……………………LS <br /> <br /> <br />XXII. PUMP AND DRIVER RECONDITIONING OR REPLACEMENT <br /> <br />A. Prevailing Specifications: None <br />B. Additions: <br /> <br />1. Any new column pipe installed shall be epoxy coated. <br />a. Any abrasion during installation shall be coated onsite with the same product. <br />2. Reconditioned pipe shall not be coated. <br />3. The City and the contractor shall not know of the condition of the pump and driver, and other system <br />components such as the column pipe and shaft, until the pump and driver are removed for <br />inspection. As such, an allowance shall be included in the bid proposal. This allowance shall be <br />included in the bid proposal as follows: <br /> <br />Well component reconditioning/replacement ……………………LS <br /> <br />XXIII. REPLACEMENT MOTOR <br /> <br />A. Prevailing Specifications: None <br />B. Additions: <br /> <br />1. Motor submittals shall be provided to the Owner for review and approval prior to ordering the motor. <br />a. Complete listing of requested exceptions to the requirements of the Contract Documents is <br />required. <br />b. Provide address and phone number of the nearest parts/repair service centers and nearest <br />manufacturer’s representative. <br />c. Provide time of delivery. <br />2. Product Data: <br />a. Manufacturer’s literature, illustrations, specifications, paint certification (If required) and <br />engineering data including; dimensions, materials, size, weight, and parts lists for all <br />components in sufficient detail to allow an item-by-item comparison with the Contract <br />Documents. <br />3. Operation and Maintenance Manuals: <br />a. Submit complete operation and maintenance manuals, including shop and field test reports, <br />maintenance data and schedules, description of operation, and spare parts information. <br />4. Delivery, Storage, and Handling <br />a. Prior to shipping, completely inspect products to assure that components are complete and <br />comply with all requirements. Box or crate products as required to prevent damage during <br />shipment. Protect machined surfaces and matching connections to prevent damage.
The URL can be used to link to this page
Your browser does not support the video tag.