My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - East Race Sidewalk Repair Proj No. 117-130 - Walsh & Kelly, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - East Race Sidewalk Repair Proj No. 117-130 - Walsh & Kelly, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 6:56:23 PM
Creation date
11/24/2020 6:54:59 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 10/31/2017 Page - 4 Public Works Quote <br />V. INDEMNIFICATION <br /> <br />A. Prevailing Specifications: None <br />B. Additions: <br /> <br />1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents, <br />officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees, <br />and other expenses, arising from or out of the negligent performance of this Contract by Contractor, <br />or because of arising out of any defect in the goods, materials or equipment supplied by the Quote <br />provider. <br /> <br />VI. INSURANCE <br /> <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 103 <br />B. Additions: <br />1. All Contractors and subcontractors doing business with the City of South Bend shall present a <br />Certificate of Insurance showing coverage in the following minimum amount: <br />a. General Liability: Premises-Completed Operations or Products, Bodily Injury and Property <br />Damage Combined Single Limit - $5,000,000. <br />b. There shall be no exclusion for explosion, collapse or underground hazard. <br />c. Workmen’s Compensation: Statutory State of Indiana Employer's Liability - $100,000. <br />d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000. <br />e. The City of South Bend shall be named as additional insured on the Certificate of Insurance. <br /> <br />VII. CONTROL OF WORK <br /> <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 105 <br />B. Additions: <br />1. The complete responsibility for this project lies with the Director of Public Works of the City of South <br />Bend, Indiana acting through his authorized representatives. <br />2. Construction Engineering - The Contractor shall provide all the necessary, qualified personnel, <br />equipment and supplies to perform all work required under this item. There will be no direct payment <br />for this item. <br />3. The contractor is responsible to maintain the site which includes but is not limited to; dust control, <br />site security, erosion control, and protecting adjacent properties. <br />4. All work activities and closures of the East Race shall be coordinated by the Contractor and <br />approved by the Parks and Recreation Department such that it does not interfere with scheduled <br />events at the East Race. No dewatering or restriction of the East Race during the weekends shall <br />be permitted without prior approval. Work hours for the Project shall be from 7:00 a.m. through 6:00 <br />p.m., Monday through Friday. No work shall be permitted on weekends, Holidays, or after hours <br />unless approved by the City of South Bend Department of Public Works. <br />5. Any dewatering required for any work activities shall be incidental to the work item and not be paid <br />for separately. <br /> <br />VIII. LEGAL RELATIONS <br /> <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 107w <br />B. Additions: <br />1. The Owner, where mentioned in these documents, is the City of South Bend. The Engineer, where <br />mentioned in these documents, is Lawson-Fisher Associates P.C. <br />2. The Contractor shall apply for and obtain any and all required permits for the work from local, state, <br />and federal agencies and shall comply with permit requirements, including the St. Joseph County <br />/ City of South Bend Building Department. <br />3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor <br />shall provide the Engineer with proof that the Contractor is duly licensed, qualified and registered <br />with the Secretary of State of Indiana to engage in business within the State of Indiana. <br />4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner <br />reserves the right to immediately terminate the public work project awarded should the Contractor
The URL can be used to link to this page
Your browser does not support the video tag.