My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - East Race Sidewalk Repair Proj No. 117-130 - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - East Race Sidewalk Repair Proj No. 117-130 - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 6:54:58 PM
Creation date
11/24/2020 6:54:26 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />PROJECT NAME: East Race Sidewalk Repair (Under Colfax) <br />PROJECT NO. 117-130 <br />QUOTES DUE November 24, 2020 before 9:00 a.m. local time <br />(Must be completed for all quotes. Please type or print) <br />Date: November 24 2020 Firm: Selge Construction Co., Inc. <br />Address: 2833 South 11th Street <br />City/State/Zip: Niles, MI 49120 Telephone Number: J269 684-0842 <br />Agent of Bidder (if Applicable): NIA <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />East Race Sidewalk Repair Under Colfax <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated November 2020 1 for the sum of (enter the Total Quote as shown on the Proposal) <br />One Hundred Twenty Two Thousand Five Hundred Twenty Nine Dollars and Zero Cents ($ 122,529.00 ) <br />(Enter Sum of Total Quote plus Alterna'e: shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />Therese J. Dorau, Member <br />(Signature) <br />Robert Kuhns, Project Engineer <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />day of <br />Jordan V. Gathers, Member <br />Joseph R. Molnar, Member <br />Attest: Linda M. Martin, Clerk <br />20 <br />Version 10/31/2017 Page - 17 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.