Laserfiche WebLink
Clak <br />..UQUOTE/PROPOSAL CITY OF SOUTH BENDuf <br />PROJECT NAME Curb & Sidewalk Repair <br />PROJECT NO. 120-001A <br />November 24, 2020 at 9:00am Local Time — electronic <br />QUOTES DUE quotes should be submitted to bpwbids(&-south bend in. gov <br />Base Quote <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit <br />Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />330 <br />SYS <br />26.00 <br />8,580 <br />2 <br />CONCRETE SIDEWALK, 4 -IN <br />330 <br />SYS <br />69.00 <br />22,770 <br />3 <br />CONCRETE CURB, REMOVE <br />375 <br />LFT <br />16.00 <br />6,000 <br />4 <br />CONCRETE CURB, MODIFIED <br />375 <br />LFT <br />50.00 <br />18,750 <br />5 <br />CONCRETE APPROACH, REMOVE <br />125 <br />SYS <br />48.00 <br />6,000 <br />6 <br />PCCP FOR APPROACHES, 6 -IN <br />125 <br />SYS <br />120.00 <br />15,000 <br />7 <br />TOPSOIL AND SEEDING <br />210 <br />SYS <br />21.00 <br />4,410 <br />BASE QUOTE TOTAL $ 81,510 <br />Alternate 1 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit <br />Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />55 <br />SYS <br />55.00 <br />3,025 <br />2 <br />CONCRETE SIDEWALK, 4 -IN <br />55 <br />SYS <br />69.00 <br />3,795 <br />3 <br />CONCRETE CURB, REMOVE <br />90 <br />LFT <br />26.00 <br />2,340 <br />4 <br />CONCRETE CURB, MODIFIED <br />90 <br />LFT <br />50.00 <br />4,500 <br />5 <br />TOPSOIL AND SEEDING <br />50 <br />SYS <br />26.00 <br />1,300 <br />Firm: Ziolkowski Construction, Inc <br />Address: 4050 Ralph Tones Drive <br />City/State/Zip: South Bend, IN 46628 <br />C 0 A <br />vRSO <br />o SEAL 8 <br />rte, <br />ALTERNATE 1 TOTAL $ 14,960 <br />Telephone Number: _( 574 ) 287-1811 <br />Fax Number: ( S74 ) 234-0151 <br />By yJ L��CLf� Ld/ <br />(Signature) <br />Bill Favors, President <br />(Printed Name of Person Signing) <br />Version 2/14/2020 Page - 16 Public Works Quote <br />