My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Curb & Sidewalk Repair Proj No. 120-001A - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Curb & Sidewalk Repair Proj No. 120-001A - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 6:49:23 PM
Creation date
11/24/2020 6:49:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME Curb & Sidewalk Repair <br />PROJECT NO. 120-001A <br />65 <br />November 24, 2020 at 9:00am Local Time — electronic <br />QUOTES DUE quotes should be submitted to b wbids southbendin.aov <br />Base Quote <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit <br />Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />330 <br />SYS <br />$34.00 <br />$11,220.00 <br />2 <br />CONCRETE SIDEWALK, 4 -IN <br />330 <br />SYS <br />$59.00 <br />$19,470.00 <br />3 <br />CONCRETE CURB, REMOVE <br />375 <br />LFT <br />$40.00 <br />$15,000.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />375 <br />LFT <br />$59.00 <br />$22,125.00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />125 <br />SYS <br />$48.00 <br />$6,000.00 <br />6 <br />PCCP FOR APPROACHES, 6 -IN <br />125 <br />SYS <br />$80.00 <br />$10,000.00 <br />7 <br />TOPSOIL AND SEEDING <br />210 <br />SYS <br />$45.00 <br />$9,450.00 <br />BASE QUOTE TOTAL $93,265.00 <br />Alternate 1 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit <br />Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />55 <br />SYS <br />$34.00 <br />$1,870.00 <br />2 <br />CONCRETE SIDEWALK, 4 -IN <br />55 <br />SYS <br />$59.00 <br />$3,245.00 <br />3 <br />CONCRETE CURB, REMOVE <br />90 <br />LFT <br />$40.00 <br />$3,600.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />90 <br />LFT <br />$59.00 <br />$5,310.00 <br />5 <br />TOPSOIL AND SEEDING <br />50 <br />SYS <br />$45.00 <br />$2,250.00 <br />ALTERNATE 1 TOTAL $16,275.00 <br />Firm: cdv s+rC4 CA ev, (-C.., . 0 1.1tr. . <br />Address: 2 S 200 S(Z 2 <br />City/State/Zip: 53 ) .Tjj q(o 0 t 1 Telephone Number: (5-74 Z V0 l <br />Fax Number: 233 — 3`i �04 <br />By 2, 4, <br />(Signature) <br />)Zft/� t� Iya,r" ) sat's MjVr, <br />(Printed Name of Person Signing) <br />Version 2/14/2020 Page - 16 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.