BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Sheridan Street and Sample Street Signal Improvements Project Number: 116-127A
<br />For Bids Due: November 24, 2020
<br />Contractor Name: Rieth Riley Construction Co., Inc.
<br />BASE BID
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />CONSTRUCTION ENGINEERING
<br />1
<br />LS
<br />$3,900.00
<br />$3,900.00
<br />2
<br />MOBILIZATION AND DEMOBILIZATION
<br />1
<br />LS
<br />$28,847.19
<br />$28,847.19
<br />3
<br />ICLEARING RIGHT OF WAY
<br />1
<br />LS
<br />$4,938.62
<br />$4,938.62
<br />4
<br />EXPOSE AT&T CABLE
<br />80
<br />LFT
<br />$82.45
<br />$6,596.00
<br />6
<br />CURB, CONCRETE, REMOVE
<br />229
<br />LFT
<br />$12.09
<br />$2,768.61
<br />7
<br />SIDEWALK CONCRETE, REMOVE
<br />202
<br />SYS
<br />$23.57
<br />$4,761.14
<br />8
<br />INLET, REMOVE
<br />3
<br />EACH
<br />$325.00
<br />$975.00
<br />9
<br />SIGNAL POLE FOUNDATION, REMOVE
<br />4
<br />EACH
<br />$250.00
<br />$1,000.00
<br />10
<br />BORROW
<br />50
<br />CYS
<br />$1.00
<br />$50.00
<br />11
<br />EXCAVATION, COMMON
<br />225
<br />CYS
<br />$30.90
<br />$6,952.50
<br />12
<br />TEMPORARY INLET PROTECTION
<br />{BAG PROTECTION)
<br />4
<br />EACH
<br />$346.17
<br />$1,384.68
<br />13
<br />ISUBGRADE TREATMENT, TYPE II
<br />105
<br />SYS
<br />$50.16
<br />$5,266.80
<br />14
<br />ITEM WAS REMOVED
<br />$0.00
<br />15
<br />COMPACTED AGGREGATE NO 53
<br />107
<br />CYS
<br />$82.47
<br />$8,824.29
<br />16
<br />MILLING, ASPHALT, 1.5 IN.
<br />546
<br />SYS
<br />$7.85
<br />$4,286.10
<br />17
<br />HMA, SURFACE, TYPE B
<br />78
<br />TON
<br />$139.61
<br />$10,889.58
<br />18
<br />HMA FOR WIDENING, TYPE B
<br />64
<br />TON
<br />$137.67
<br />$8,810.88
<br />19
<br />HMA FOR PATCHING, TYPE B
<br />5
<br />TON
<br />$386.61
<br />$1,933.05
<br />20
<br />RETROFITTED TIE BARS
<br />120
<br />EACH
<br />$28.43
<br />$3,411.60
<br />21
<br />PCCP FOR PATCHING, 10 IN.
<br />209
<br />SYS
<br />$172.91
<br />$36,138.19
<br />22
<br />CURB RAMP, CONCRETE
<br />56
<br />SYS
<br />$291.61
<br />$16,330.16
<br />23
<br />DETECTABLE WARNING SURFACES
<br />12
<br />SYS
<br />$141.06
<br />$1,692.72
<br />24
<br />SIDEWALK, CONCRETE, 4 IN
<br />203
<br />SYS
<br />$56.24
<br />$11,416.72
<br />25
<br />CURB, CONCRETE
<br />408
<br />LFT
<br />$29.35
<br />$11,974.80
<br />26
<br />CURB, INTEGRAL, CONCRETE
<br />102
<br />LFT
<br />$30.11
<br />$3,071.22
<br />27
<br />PCCP FOR APPROACHES, 9 IN.
<br />105
<br />SYS
<br />$118.52
<br />$12,444.60
<br />28
<br />SODDING, NURSERY
<br />280
<br />SYS
<br />$8.40
<br />$2,352.00
<br />29
<br />TOPSOIL
<br />43
<br />CYS
<br />$46.30
<br />$1,990.90
<br />30
<br />FIRE HYDRANT RELOCATE
<br />1
<br />EACH
<br />$3,500.00
<br />$3,500.00
<br />31
<br />WATER MAIN, DUCTILE IRON, 6 IN
<br />25
<br />LFT
<br />$53.00
<br />$1,325.00
<br />32
<br />WATER MAIN METER PIT
<br />1
<br />EACH
<br />$360.00
<br />$360.00
<br />33
<br />PIPE, INDOT TYPE 2, 10 IN.
<br />24
<br />LFT
<br />$55.00
<br />$1,320.00
<br />34
<br />STANDARD INLET, WITH CASTING
<br />4
<br />EACH
<br />$3,300.00
<br />$13,200.00
<br />35
<br />MAINTAINING TRAFFIC
<br />1
<br />LS
<br />$13,060.54
<br />$13,060.54
<br />36
<br />TEMPORARY PAVEMENT MARKING, REMOVABLE,
<br />4 IN.
<br />4,267
<br />LFT
<br />$1.59
<br />$6,784.53
<br />37
<br />SIGN, SHEET, SHEETING TYPE IV, WITH LEGEND,
<br />0.100 IN.
<br />4
<br />EACH
<br />$150.00
<br />$600.00
<br />38
<br />ITRAFFIC SIGNAL EQUIPMENT, REMOVE
<br />1
<br />EACH
<br />$1,500.00
<br />$1,500.00
<br />39
<br />MISCELLANEOUS EQUIPMENT FOR TRAFFIC
<br />SIGNALS
<br />1
<br />LS
<br />$100.00
<br />$100.00
<br />40
<br />CONDUIT, SCHEDULE 80, PVC, 2 IN.
<br />200
<br />LFT
<br />$4.50
<br />$900.00
<br />41
<br />CONDUIT, SCHEDULE 80, PVC, 3 IN.
<br />250
<br />LFT
<br />$11.50
<br />$2,875.00
<br />42
<br />EMERGENCY VEHICLE PREEMPTION
<br />1
<br />EACH
<br />$10,500.00
<br />$10,500.00
<br />43
<br />VIDEO VEHICLE DETECTOR SYSTEM
<br />1
<br />EACH
<br />$38,500.00
<br />$38,500.00
<br />44
<br />PEDESTRIAN COUNTDOWN LED WALK - DON'T
<br />WALK SIGNALS
<br />8
<br />EACH
<br />$750.00
<br />$6,000.00
<br />45
<br />PEDESTRIAN PUSH BUTTON, APS
<br />8
<br />EACH
<br />$950.00
<br />$7,600.00
<br />46
<br />TESCO CABINET
<br />1
<br />EACH
<br />$7,250.00
<br />$7,250.00
<br />47
<br />TRAFFIC SIGNAL CONTROLLER AND CABINET
<br />1
<br />EACH
<br />$25,000.00
<br />$25,000.00