Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Seitz Park Reconstruction <br />Project Number: 117-093A <br />i <br />For Bids Due: November 24, 2020 <br />Contractor Name: <br />E-28 <br />Luminaire, Type 1 <br />1 <br />EACH <br />4,041.00 <br />$4,041 <br />E-29 <br />Luminaire, Type L8 <br />3 <br />EACH <br />570.34 <br />$1,711 <br />E-30 <br />Handhole, Lighting <br />1 <br />EACH <br />450.00 <br />$450 <br />E-31 <br />Schedule 80 HDPE, 0.75 inch <br />125 <br />LFT <br />5.84 <br />$730 <br />E-32 <br />Schedule 80 HDPE, 1.5 inch <br />145 <br />LFT <br />6.44 <br />$933 <br />E-33 <br />Wire, 3#8, No. 8 AWG, Stranded Copper <br />145 <br />LFT <br />5.00 <br />$724 <br />E-34 <br />Wire, 2#12, No 12AWG, Solid Copper <br />125 <br />LFT <br />2.28 <br />$285 <br />DIVISION E TOTAL <br />BID PACKAGE NO. 2 (Division F) <br />DIVISION F BASE BID <br />$447,001 <br />F-1 <br />Remediation Allowance <br />1 <br />LSUM <br />5,000.00 <br />$5,000 <br />F-2 <br />Maintenance of Traffic <br />1 <br />LSUM <br />1,569.00 <br />$1,569 <br />F-3 <br />Permit Compliance Administration <br />1 <br />LSUM <br />1,500.00 <br />$1,500 <br />F-4 <br />Mobilization and Demobilization <br />1 <br />LSUM <br />3,138.00 <br />$3,138 <br />F-5 <br />Construction Engineering <br />1 <br />LSUM <br />3,661.00 <br />$3,661 <br />F-6 <br />Video Record <br />1 <br />LSUM <br />1,046.00 <br />$1,046 <br />F-7 <br />Temporary Erosion and Sediment Control <br />1 <br />LSUM <br />2,092.00 <br />$2,092 <br />F-8 <br />Floating Dock, Removal <br />1 <br />LSUM <br />13,285.00 <br />$13,285 <br />F-9 <br />Floating Marina Dock System <br />1 <br />LSUM <br />89,601.00 <br />$89,601 <br />DIVISION F TOTAL <br />Version 4/2/2019 Contractor's Bid for Public Works - 18 <br />$120,892 <br />