Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Seitz Park Reconstruction <br />Project Number: 117-093A <br />For Bids Due: November 24, 2020 <br />Contractor Name: <br />D-69 <br />Exterior Security/IT System <br />1 <br />LSUM <br />17,090.00 <br />$17,090 <br />D-70 <br />Shredded Hardwood Mulch <br />19 <br />CYS <br />86.32 <br />$1,640 <br />D-71 <br />Deciduous Tree, 2.5 inch caliper <br />17 <br />EACH <br />670.06 <br />$11,391 <br />D-72 <br />Deciduous Tree, 12 feet height, multistem <br />5 <br />EACH <br />524.80 <br />$2,624 <br />D-73 <br />Coniferous Shrubs, No, 3 Cont <br />17 <br />EACH <br />57.59 <br />$979 <br />D-74 <br />Shrubs, No. 3 Cont. <br />109 <br />EACH <br />51.78 <br />$5,644 <br />D-75 <br />Perennials, No. 1 Cont. <br />368 <br />EACH <br />14.39 <br />$5,293 <br />D-76 <br />Ornamental Grasses, No. 1 Cont. <br />72 <br />EACH <br />19.57 <br />$1,409 <br />D-77 <br />Planting Mixture <br />109 <br />CYS <br />86.31 <br />$9,407 <br />D-78 <br />Irrigation System <br />1 <br />LSUM <br />20,816.00 <br />$20,816 <br />D-79 <br />Restroom — Substructure <br />1 <br />LSUM <br />17,309.00 <br />$17,309 <br />D-80 <br />Restroom—Structural Frame <br />1 <br />LSUM <br />74,319.00 <br />$74,319 <br />D-81 <br />Restroom — Roofing <br />1 <br />LSUM <br />43,096.00 <br />$43,096 <br />D-82 <br />Restroom — Exterior Walls <br />1 <br />LSUM <br />195,812.00 <br />$195,812 <br />D-83 <br />Restroom — Interior Subdivision <br />1 <br />LSUM <br />108,784.00 <br />$108,784 <br />D-84 <br />Restroom — Wall Finishes <br />1 <br />LSUM <br />16,857.00 <br />$16,857 <br />D-85 <br />Restroom — Floor Finishes <br />1 <br />LSUM <br />16,569.00 <br />$16,569 <br />D-86 <br />Restroom — Ceiling Finishes <br />1 <br />LSUM <br />34,236.00 <br />$34,236 <br />D-87 <br />Restroom -Specialties <br />1 <br />LSUM <br />12,919.00 <br />$12,919 <br />D-88 <br />Restroom — Casework &. Wood Trim <br />1 <br />LSUM <br />17,469.00 <br />$17,469 <br />D-89 <br />Restroom - Equipment <br />1 <br />LSUM <br />5,544.00 <br />$5,544 <br />D-90 <br />Restroom—Plumbing <br />1 <br />LSUM <br />43,200.00 <br />$43,200 <br />D-91 <br />Restroom - HVAC <br />1 <br />LSUM <br />29,288,00 <br />$29,288 <br />D-92 <br />Restroom — Electrical Systems (including <br />Technology) <br />1 <br />LSUM <br />63,865.00 <br />$63,865 <br />D-93 <br />Band Shelter - Substructure <br />1 <br />LSUM <br />16,041.00 <br />$16,041 <br />D-94 <br />Band Shelter—Structural Frame <br />1 <br />LSUM <br />55,846.00 <br />$55,846 <br />D-95 <br />Band Shelter- Roofing <br />1 <br />LSUM <br />71,547.00 <br />$71,547 <br />D-96 <br />Band Shelter— Exterior Walls <br />1 <br />LSUM <br />87,341.00 <br />$871341 <br />D-97 <br />Band Shelter- Plumbing <br />1 <br />LSUM <br />6,486.00 <br />$6,486 <br />D-98 <br />Band Shelter— Electrical Systems (including <br />Technology) <br />1 <br />LSUM <br />28,627.00 <br />$28,627 <br />DIVISION D TOTAL <br />Version 4/2/2019 Contractor's Bid for Public Works - 16 <br />.$2,196,694 <br />