BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Seitz Park. Reconstruction
<br />Project Number: 117-093A
<br />For Bids Due: November 24, 2020
<br />Contractor Name:
<br />C-52
<br />Foundation, Lighting
<br />11
<br />EACH
<br />1,405.37
<br />$15,459
<br />C-53
<br />Luminaire, Type L1
<br />9
<br />EACH
<br />4,284.23
<br />$38,558
<br />C-54
<br />Luminaire, Type L1B
<br />2
<br />EACH
<br />4,211.00
<br />$8,422
<br />C-55
<br />Luminaire, Type L5
<br />3
<br />EACH
<br />1,140.00
<br />$3,420
<br />C-56
<br />Luminaire, Type L7
<br />3
<br />EACH
<br />988.34
<br />$2,965
<br />C-57
<br />Luminaire, Type L11
<br />2
<br />EACH
<br />722,50
<br />$1,445
<br />C-58
<br />Handhole, Lighting
<br />9
<br />EACH
<br />1,015.89
<br />$9,143
<br />C-59
<br />Schedule 80 HDPE, 0.75 inch
<br />150
<br />LFT
<br />6.06
<br />$909
<br />C-60
<br />Schedule 80 HDPE, 1.5 inch
<br />425
<br />LFT
<br />7,15
<br />$3,036
<br />C-61
<br />Schedule 80 HDPE, 2 inch
<br />400
<br />LFT
<br />7.84
<br />$3,133
<br />C-62
<br />Wire, 3#6, No 6 AWG, Stranded Copper
<br />300
<br />LFT
<br />6.85
<br />$2,055
<br />C-63
<br />Wire, 3#8, No 8 AWG, Stranded Copper
<br />825
<br />LFT
<br />5.00
<br />$4,120
<br />C-64
<br />Wire, 2#12, No 12AWG, Solid Copper
<br />150
<br />LFT
<br />2.26
<br />$338
<br />C-65
<br />Forest Light Reinstallation
<br />1
<br />LSUM
<br />9,205.00
<br />$9,205
<br />C-66
<br />Forest Light Donor Recognition Sign
<br />1
<br />LSUM
<br />16,946.00
<br />$16,946
<br />C-57
<br />Pedestal Receptacle, Exterior
<br />7
<br />EACH
<br />1,766.86
<br />$12,368
<br />C-68
<br />Excelsoir Blanket
<br />45
<br />SYS
<br />28.78
<br />$1,295
<br />C-69
<br />Shredded Hardwood Mulch
<br />15
<br />CYS
<br />86.34
<br />$1,295
<br />C-70
<br />Deciduous Tree, 2.5 inch caliper
<br />8
<br />EACH
<br />632.88
<br />$5,063
<br />C-71
<br />Shrubs, No. 3 Cont.
<br />68
<br />EACH
<br />54.09
<br />$3,678
<br />C-72
<br />Perennials, No. 1 Cont.
<br />302
<br />EACH
<br />14.39
<br />$4,344
<br />C-73
<br />Ornamental Grasses, No. 1 Cont.
<br />39
<br />EACH20.72
<br />$808
<br />C-74
<br />Planting Mixture
<br />80
<br />CYS
<br />86.30
<br />$6,904
<br />C-75
<br />Irrigation System
<br />1
<br />LSUM
<br />46,234.00
<br />$46,234
<br />DIVISION C TOTAL
<br />DIVISION D - BASE BID
<br />$1,438,423
<br />Item No.
<br />Line Item
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />D-1
<br />Remediation Allowance
<br />1
<br />LSUM
<br />5,000.00
<br />$5,000
<br />D-2
<br />Maintenance of Traffic
<br />1
<br />LSUM
<br />1,569.00
<br />$1,569
<br />D-3
<br />Permit Compliance Administration
<br />1
<br />LSUM
<br />2,500.00
<br />$2,500
<br />D-4
<br />Mobilization and Demobilization
<br />1
<br />LSUM
<br />164,563.00
<br />$164,563
<br />Version 4/2/2019 Contractor's Bid for Public Works -13
<br />
|