Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Seitz Park Reconstruction <br />Project Number: 117-093A <br />For Bids Due: November 24, 2020 <br />Contractor Name: Larson-Danielson Construction Co., Inc. <br />A-28 Compacted Aggregate, No. 53 90 TON $63.31 $5,697.90 <br />A-29 Sidewalk, 6-in 116 SYS $98.22 $11,393.52 <br />A-30 Straight Curb 84 LFT $41.34 $3,472.56 <br />A-31 Sidewalk, 6-in, Integral Color, Finish "A" 137 SYS $140.26 $19,215.62 <br />A-32 Sidewalk, 6-in, Integral Color, Finish "B" 24 SYS $208.51 $5,004.24 <br />A-33 Concrete Walk False Joints 284 LFT $1.24 $352.16 <br />A-34 Expansion Joint, Concrete Walk 234 LFT $6.48 $1,516.32 <br />A-35 Sidewalk Joint Transitions 104 LFT $1.96 $203.84 <br />A-36 Unit Paver 38 SYS $309.20 $11,749.60 <br />A-37 Litter Receptacle 1 EACH $934.67 $934.67 <br />A-38 Recycling Receptacle 1 EACH $934.67 $934.67 <br />A-39 Bench 6 EACH $1,381.96 $8,291.76 <br />A-40 Tree Grate 1 EACH $3,284.23 $3,284.23 <br />A-41 Type 5 Rail with Custom Infill Panel, 48 inch 156 LFT $894.58 $139,554.48 <br />A-42 Type 5 Rail with Custom Infill Panel, Custom Curved, 48 <br />inch 131 LFT $385.13 $50,452.03 <br />A-43 Lighting, Pole, 12 ft 5 EACH $5,319.88 $26,599.40 <br />A-44 Foundation, Lighting 5 EACH $1,417.70 $7,088.50 <br />A-45 Luminaire, Type L1A 5 EACH $4,393.03 $21,965.15 <br />A-46 Schedule 80 HDPE, 0.75 inch 75 LFT $6.39 $479.25 <br />A-47 Schedule 80 HDPE, 1.5 inch 275 LFT $10.80 $2,970.00 <br />A-48 Wire, 3#6, No 6 AWG, Stranded Copper 275 LFT $6.94 $1,908.50 <br />A-49 Mobilization and Demobilization for Sodding 2 EACH $422.06 $844.12 <br />A-50 Topsoil 4 CYS $58.03 $232.12 <br />A-51 Sodding, Nursery 33 SYS $10.55 $348.15 <br />A-52 Excelsoir Blanket 357 SYS $2.64 $942.48 <br />A-53 Shredded Hardwood Mulch 21 CYS $79.14 $1,661.94 <br />A-54 Deciduous Tree, 2.5 inch caliper 6 EACH $580.33 $3,481.98 <br />A-55 Coniferous Shrubs, No. 3 Cont 47 EACH $52.76 $2,479.72 <br />A-56 Shrubs, No. 3 Cont.221 EACH $47.48 $10,493.08 <br />A-57 Perennials, No. 1 Cont.243 EACH $13.19 $3,205.17 <br />A-58 Ornamental Grasses, No. 1 Cont. 106 EACH $17.94 $1,901.64 <br />A-59 Planting Mixture 122 CYS $79.14 $9,655.08 <br />Version 4/2/2019 Contractor's Bid for Public Works - 2