My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Ductile Iron Pipes, Valves and Hydrant Material Specs Proj No. 120-054 - Ferguson Waterworks
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Ductile Iron Pipes, Valves and Hydrant Material Specs Proj No. 120-054 - Ferguson Waterworks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 6:13:24 PM
Creation date
11/24/2020 6:12:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Document A310 TM - 2010 <br />Conforms with The American Institute of Architects AIA Document 310 <br />ML e e <br />CONTRACTOR: <br />('Vane, legal slats a• rind addres+) <br />Ferguson Enterprises, LLC <br />dba Ferguson Waterworks <br />1077 Oliver Plow Court <br />South Bend, IN 46601 <br />OWNER: <br />(Namit, legalslamsandaddr=) <br />City of South Bend <br />1316 County -City Building <br />227 West Jefferson Boulevard <br />South Bend, IN 46601 <br />BOND AMOUNT: 5% <br />SURETY: <br />QVimre, legal stoner mid prfucipal place rjbrevineev) <br />Federal Insurance Company <br />202B Hall's Mill Road <br />Whitehouse Station, NJ 08889 <br />Mailing Address for Notices <br />202B Hall's Mill Road <br />Whitehouse Station, New Jersey 08889 <br />This document has Important <br />legal consequences. Consultation <br />with an attorney is encouraged <br />with respect to Its completion or <br />modification. <br />Any singular reference to <br />Contractor, Surety, Owner or <br />other party shall be considered <br />plural where applicable. <br />Five Percent of the Base Bid plus Any Alternates <br />PROJECT: <br />(,Name, location oraddrug mrd14•oJectn umber {J'm0) <br />Ductile Iron Pipes, Valves, and Hydrants Project No. 120-054 <br />The Contractor and Surety arc bound to die Owner in the amount set forth above• for the payment of which the Contractor and Surety bind <br />themselves, their heirs, executors, administrators, successors and assigns,jointly and severally, as provided herein. The conditions of tins <br />Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period <br />as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with die Owner in accordance with <br />the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety, admitted in <br />the jurisdiction of the Project and otheniise acceptable to the Owner, for the faithful performance of such Contract and for the prompt <br />payment of labor and material famished in the prosecution thereof: or (2) pays to the Owner the difference, not to exceed the amount of <br />this Bond, between the amount specified in said bid and such larger amount for which die Owner may in good faith contract whir another <br />party In per iimi lite work covered by said bid, then this obligation shall be null and void, otherwise ro remain in full Ibrce and eflecl. Tla <br />Surety heretq• ivaives any notice of all agreement between the Oiiner and Contractor to extend the time in which the Owner may accept the <br />bid. Waiver oft olico by the Surety shall not apply hr any extension exceeding sixty (60) days in the aggregate beyond the [into for <br />acceptance ol'bids specified in the bid documents, and Hie Owner and Contractor shall obtain the Surely's consent lbr an extension beyond <br />sixty (60) days. <br />If this Bond is issued in connection with a subcontmctots bid to a Contractor, the tome Contractor in this Bond shall be doomed to be <br />Subcontractor and the term Owner shall be deemed to be Contractor. <br />When this Bond has been famished to comply with it statutory or other legal requirement in [be location of the Project, any provision in <br />this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conliaming to such <br />statutory or other legal requirement sball be deemed incorporated heroin. When so Ibmislied, the intent is that (Itis Bund Nhall be construed <br />as a statutory bond and not as a common late bond. ,teal air r r r r 4, <br />Signed and scaled this 24th day of November, 2020. <br />J :'GOMPA,y�,QiN <br />/ELI W - <br />F-raucon Fntrpri�c _q, LLC dha FPrgo�Vt�af&ty4or •, (ti : <br />(IVimm)- <br />(flde) .SEAL .•' • :� <br />r ,,;i I ^ Federal InsuranceComptany�., <br />/nerd)'' <br />(mtmevx) W Lee Wadkins By: <br />` •, "% li <br />Y . <br />(liNe) Pablo Rios, Jr. Attorne'�?liacfact <br />i <br />S•00841AS 8110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.