My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Ductile Iron Pipes, Valves and Hydrant Material Specs Proj No. 120-054 - Ferguson Waterworks
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Ductile Iron Pipes, Valves and Hydrant Material Specs Proj No. 120-054 - Ferguson Waterworks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 6:13:24 PM
Creation date
11/24/2020 6:12:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Document A310 TM - 2010 <br />Conforms with The American Institute of Architects AIA Document 310 <br />Bid Bond <br />CONTRACTOR: <br />(,'Warne, legaisfaPos and nddraty) <br />Ferguson Enterprises, LLC <br />dba Ferguson Waterworks <br />1077 Oliver Plow Court <br />South Bend, IN 46601 <br />OWNER: <br />(Name, legalslaersandaddrars) <br />City of South Bend <br />1316 County -City Building <br />227 West Jefferson Boulevard <br />South Bend, IN 46601 <br />BOND AMOUNT: 5% <br />SURETY: <br />(Mirme, leget/s/alux and principal place glhraineyy) <br />Federal Insurance Company <br />2028 Hall's Mill Road <br />Whitehouse Station, NJ 08889 <br />Mailing Address for Notices <br />202B Hall's Mill Road <br />Whitehouse Station, New Jersey 08889 <br />This document has important <br />legal consequences. Consultation <br />with an attorney is encouraged <br />with respect to Its completion or <br />modification. <br />Any singular reference to <br />Contractor, Surety, Owner or <br />other party shall be considered <br />plural where applicable. <br />Five Percent of the Base Bid plus Any Alternates <br />PROJECT: <br />(Nana, location oraddnss andl'raJaetunmber, i1 mr}) <br />Ductile Iron Pipes, Valves, and Hydrants Project No. 120-054 <br />The Contractor and Surety aro bound to the Owner in ilia amount set forth above• for the payment of which the Contractor and Surety bind <br />themselves• their heirs, oxecutors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this <br />Bond aro such that if ilia Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period <br />as may, be agreed to by tiro Owner and Contractor, and the Contractor either (I ) enters into a contract width the Owner in accordance with <br />the termsofsuch bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in <br />the jurisdiction of the Project and otherwise acceptable to the Oaner, for the faithful perfomtance of such Contract and for the prompt <br />payment of labor and material fitmished in ilia prosecution thereof: or (2) pays to ilia Owner the difference, not to exceed ilia amount of <br />this Bond, between the amount specified in said bid and such larger amount for which ilia Owner may in good faith contract with another <br />party to peribrin the work covered by said bid, then this obligation shall be null and void, otherwise to remain in fill force and effect. The <br />Surety hereby waives any notice of un agreement between the Owner and Contractor to extend the time in which ilia Ownermay, accept the <br />bid. Waiverol'notice by ilia Surety skull not apply to tiny extension exceeding sixty (60) days in ilia aggregate beyond the time for <br />ucceplunce orbids specified in the bid documents, unit ilia Owner and Contractor %hull obtain ilia Surety's consent lir an extension beyond <br />%ixly (60) days. <br />If this Bond is issued in connection with a subcwltmetor's bid to a Contractor, the tcnn Contractor in this Bond shall be doomed to be <br />Subcontractor and the term Owner shall be deemed to be Contractor. <br />When this nand has been filmished ht comply with it statutory or other legal requirement in the locution or ilia Project, any, provision in <br />this nand conflicting with mid statutory or legal requirement shall be deemed deleted herefrom and provi%ions conhrmting to such <br />statutory or other legal requirement %hail be deemed incorporated herein. Wizen so rumhabed, ilia intent i% that [Itis nand shall be construed <br />a%a statutory bond and nal as coniniotl law band. ..x80001/Ir <br />Signed and scaled this 24th day of November, 2020. <br />(U9bress) <br />(11711ness) W Lee Wadkins <br />Rios, Jr. <br />S•00541AS 8110 <br />r0 <br />trNTF ''• <br />RA <br />N? <br />:r <br />GININ <br />nmHN, <br />
The URL can be used to link to this page
Your browser does not support the video tag.