My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Ductile Iron Pipes, Valves and Hydrant Material Specs Proj No. 120-054 - Core & Main
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Ductile Iron Pipes, Valves and Hydrant Material Specs Proj No. 120-054 - Core & Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 6:12:06 PM
Creation date
11/24/2020 6:11:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />VIII. WARRANTY <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. All parts shall include the following: <br />(i) Performance specifications; <br />(ii) Bill of materials <br />(iii) Warranties on all parts; and <br />(iv) Installation and safety requirements. <br />IX. CONTROL OF WORK <br />A. Prevailing Specifications/INDOT Standard Specifications Section: 105 <br /> <br />B. Additions: <br />1. The complete responsibility for this project lies with the Director of Public Works of the <br />City of South Bend, Indiana acting through his authorized representatives. <br />X. DEFAULT AND TERMINATION <br />A. Prevailing Specifications/INDOT Standard Specifications Section: 108 <br /> <br />B. Additions: <br /> <br />1. The obligation to perform under the terms of this Agreement may be terminated by an <br />official of the Department of Public Works, with approval from the Board of Public Works, <br />with or without cause, upon fourteen (14) calendar days written notice to the Contractor. <br />This Agreement may be terminated by Contractor upon fourteen (14) calendar days <br />written notice to the Department of Public Works in the event of substantial failure of <br />Public Works employees and agents to perform in accordance with the terms hereof. If <br />an official of the Public Works Department terminates the Contract for any cause, it shall <br />deduct from whatever is owed from the Contractor on the Contact or any other contract, <br />any amount sufficient to compensate the City of South Bend for any damages suffered by <br />it, including but not limited to, the cost difference in the materials between the primary <br />and secondary bidder because of the Contractor’s wrongdoing. <br />XI. RETAINAGE AND FINAL PAYMENT <br />A. Prevailing Specifications/INDOT Standard Specifications Section: 109 <br /> <br />B. Additions: <br /> <br />1. Payments will be made every thirty (30) calendar days. <br /> <br />2. There will be NO Retainage. <br /> <br />3. Contractor shall invoice using the same nomenclature as specified in the bid proposal for <br />all items. <br /> <br />XII. CORRECTIVE ACTION/DAMAGES <br />A. Prevailing Specifications: None
The URL can be used to link to this page
Your browser does not support the video tag.