Laserfiche WebLink
MATERIAL 109.05 (b)(3) <br />Purchased or <br />Manufactured <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Extenstion <br />$ 240.00 <br />$ <br />S <br />$ <br />S <br />$ <br />$ <br />$ <br />MATERIALS PURCHASED <br />MATERIALS MANUFACTURED <br />TOTAL: LINE (18) + (19) <br />12 % x LINE (20) <br />GRAND TOTAL FOR MATERIALS: LINE (20)+ (21) <br />EQUIPMENT 109.05 (b)(4) <br />$0.00 (18) <br />$0.00 (19) <br />$0.00 (20) <br />SO.00 (21) <br />$0.00 (22) <br />Equipment # <br />CONTRACTOR OWNED EQUIPMENT <br />FHWA HOURLY RATE <br />HOURS <br />EXTENSION <br />$0.00 <br />pick up truck foreman <br />$25.00 <br />1.00 <br />$25.00 <br />Excavator Caterpillar 308 <br />Sw 00 <br />1.00 <br />$80.00 <br />SO.00 <br />$0.00 <br />WOO <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />SO.00 <br />Trucking - Striaght Time <br />$0.00 <br />$0.00 <br />Trucking - Over Time <br />$0.00 <br />$0.00 <br />Trucking - Double Time <br />$0.00 <br />.0 <br />TOTAL EQUIPMENT <br />$105.00 <br />(23) <br />TOTAL TRUCKING <br />$0.00 <br />(24) <br />FUEL, LUBRICANTS AND TRANSPORTATION COSTS <br />$0.00 <br />(25) <br />TOTAL LINES (23) + (24) + (25) <br />$105.00 <br />(26) <br />12 % x LINE (26) <br />$12.60 <br />(27) <br />GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) <br />$117.60 <br />(28) <br />SUBCONTRACTORS 109.05 (b)(6) <br />DESCRIPTION AMOUNT <br />WISSCO Irrigation , Inc. $11,020.28 <br />TOTAL SUBCONTRACT WEEK ENDING $11,020.28 (29) <br />7% $771.42 (31) <br />(32) <br />GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $11 ,791.70 (33) <br />TOTAL OF WORK COMPLETED FOR THE WEEK <br />TOTAL LINES (12), (17), (22), (28) & (33) $12,180.53 (34) <br />1.1 % OF BOND RATE BASED UPON LINE (34) $133.99 (35) <br />10 % x LINE (35) $13.40 (36) <br />TOTAL EXTRA WORK LINES: (34) + (35) + (36) $12,327.92 (37) <br />Page 2 of 2 <br />